SCP-7792
Keter
?
low confidence
SCP-7792
Expected annual
$8.8M
One-time setup
$24.7M
Annual recurring
$8.6M
Personnel
28
One-time setup costs are approximately $24,705,000 driven primarily by the containment chamber retrofit, contingency reserve, AI/R&D and major equipment; ongoing operating costs are approximately $8,580,000/year driven by staff wages, research/monitoring, maintenance, and legal/cover-story operations.
One-Time Capital Costs
Total: $24.7M
Annual Recurring Costs
Total: $8.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.6M/yr
Normal year with no major incidents; routine operations and scheduled maintenance only.
no breach
no large-scale memetic escalation
🚨
Minor Incident
$9.1M/yr
Localized containment anomaly requiring limited on-site remediation, targeted equipment replacement, and increased legal/PR activity.
localized sensor/robot failure
small-scale antimemetic perturbation
🚨
Major Breach
$11.6M/yr
Significant containment breach requiring MTF deployment, substantial equipment replacement, extended forensic recovery, and partial site lockdown.
large-scale structural or systems failure
sustained antimemetic spread requiring tactical response
🚨
Catastrophic Breach
$28.6M/yr
Severe escalation requiring large-scale evacuation, demolition or termination options, full activation of contingency reserve and external emergency contracting.
uncontrolled antimemetic cascade
requirement for area denial / demolition
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 15 | [#8] 12–16 guards across three shifts plus supervisors; count chosen to match recurring security payroll estimate. |
| Research Scientist | 10 | [#10] 8–12 FTE anomalous-physics / memetics / cognitive specialists; midpoint used to match research payroll. |
| Site Director / Executive Staff | 1 | [#30] Program director / executive oversight included in program overhead. |
| Administrative Staff | 2 | [#30] Procurement, HR, and administrative support included in program overhead. |
Confidence Notes
The object is antimemetic and Keter-class with deleted files and reality-instability described in the source; containment needs and incident probabilities are highly uncertain, so cost estimates are order-of-magnitude with low confidence.