SCP-7837
Keter
~
medium confidence
SCP-7837
Expected annual
$17.8M
One-time setup
$174.2M
Annual recurring
$14.1M
Personnel
86
One-time capital expenses of approximately $174.25M driven by detection/satellite procurement, aircraft acquisition, harpoon development, and a large contingency reserve; recurring annual costs are about $14.13M driven mainly by security and MTF wages, ongoing research/monitoring (detection, drones, data fusion, labs), and aircraft/transport operations.
One-Time Capital Costs
Total: $174.2M
Annual Recurring Costs
Total: $14.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.1M/yr
Normal year with containment wing and MTF fully operational and no major incidents; routine testing and modest R&D continue.
no major breaches
scheduled testing
routine R&D and sensor ops
🚨
Minor Incident
$15.1M/yr
Localized attack or capture operation causing increased consumables use, medical care, cleanup and limited infrastructure repairs.
single-site field engagement
localized environmental cleanup
increased consumables and overtime
🚨
Major Breach
$64.1M/yr
Significant breach or large-scale attack (e.g., incident similar to 7837-X1) causing casualties, site damage, and major recovery operations.
site perimeter breach
multiple casualties and infrastructure damage
extensive cleanup and reconstruction
🚨
Catastrophic Breach
$214.1M/yr
Rare, systemic event requiring full reconstruction, large-scale evacuation, international exposure mitigation, and possible deployment of destruction capabilities.
systemic containment failure
widespread contamination or public exposure
military-grade response and reconstruction
Personnel
86 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 36 | [#5] 24/7 static Site-38 guarding (12 per shift × 3 shifts). Salaries accounted in staff_wages. |
| MTF Agent / Field Operative | 50 | [#8] MTF-Eta-37 dedicated taskforce personnel (pilots, techs, medics, operators). Salaries accounted in staff_wages. |
Confidence Notes
Estimates use midpoints of wide published ranges and the analyst summary; confidence is medium because many major costs (satellites, aircraft ownership, frequency of incidents, and choice to fund destruction programs) are highly program-dependent and episodic.