SCP-7911
Unknown
?
low confidence
SCP-7911
Expected annual
$4.3M
One-time setup
$7.5M
Annual recurring
$4.2M
Personnel
23
One-time capital requirements are substantial (~$7.54M) driven by containment contingency and initial field equipment; annual recurring costs are ~ $4.15M/yr driven primarily by field teams, specialist staff, sensor subscriptions, legal/public-suppression retainers and reserve replenishment.
One-Time Capital Costs
Total: $7.5M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Normal year focused on discovery/scouting with no major incidents or construction.
routine scouting missions
regular analysis and maintenance
🚨
Minor Incident
$4.7M/yr
Localized incident requiring extra mobilization, additional outsourced forensics and temporary surge staffing.
single-site mass disappearance
urgent forensic analysis and extra deployments
🚨
Major Breach
$6.7M/yr
Significant breach/incident requiring extensive emergency response, large-scale legal and suppression actions.
widespread public exposure
multi-site emergency response
🚨
Containment Required
$10.2M/yr
SCP located and requires construction of a dedicated containment facility and ramp-up of operations.
discovery of anomaly requiring engineered containment
escalation from discovery to permanent containment
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Program Director / Executive Staff | 1 | [#1] Senior program manager (salary included in program overhead). |
| Administrative Staff | 1 | [#1] Operations coordinator / accounting and administrative overhead. |
| Field Recon Operators / MTF Agents | 12 | [#2] Two on-call 6-person reconnaissance teams (operators, medic, tech, local guide). |
| Cognitohazard / Memetics Specialists | 4 | [#14] Dedicated memetic research/trainers to develop safe protocols and countermeasures. |
| Research Scientist / GIS Analyst | 2 | [#23] Imagery, LiDAR and GPR analysis staff; GIS processing (staff included in recurring analytic budget). |
| Medical Officer | 2 | [#20] Medics on-call; medevac retainer and medical response capability. |
| Monitoring Analyst | 1 | [#22] Surveillance monitoring and data-logging analyst for fixed-site sensors. |
Confidence Notes
Estimates are order-of-magnitude with many ranged inputs and contingency items; SCP properties and required containment approach remain uncertain, so cost projections have low confidence.