SCP-7913
Keter
?
low confidence
SCP-7913
Expected annual
$31.8M
One-time setup
$588.0M
Annual recurring
$28.3M
Personnel
104
Initial build-out and one-time contingency costs are dominated by hardened facilities, site acquisition, and a large catastrophic reserve (~$588M one-time). Annual operating costs (~$28.3M/yr) are driven by security wages, research/monitoring, and legal/cover operations.
One-Time Capital Costs
Total: $588.0M
Annual Recurring Costs
Total: $28.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$28.3M/yr
Normal year with routine activations suppressed and no major containment failure.
routine activations
standard maintenance
no external incidents
🚨
Minor Incident
$33.3M/yr
Localized containment incident requiring emergency response, extra D-Class turnover, repairs, legal and PR efforts.
small breach or activation complexity
medical evacuation/repairs
local investigative interest
🚨
Major Breach
$528.3M/yr
Significant containment failure or large anomalous event requiring drawing on catastrophic reserves, national response and massive cover-up/evacuation.
partial detonation or uncontrolled activation
mass-casualty evacuation
national-level exposure
Personnel
104 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 45 | Armed perimeter and internal guards across three shifts; salaries included in staff_wages. |
| Specialized Tactical Team / Operator | 10 | On-call heavily-armed response squad; salaries and initial gear accounted for. |
| Research Scientist | 10 | On-site physicists, engineers and analysts interpreting sensor data and modeling; salaries included in staff_wages. |
| Medical Officer | 4 | Paramedics/trauma nurses and biohazard cleanup coordination; salaries and medical contracts included. |
| Engineer / Maintenance | 3 | Facility, power, HVAC and EMP hardening maintenance staff. |
| Administrative Staff | 5 | Site admin, HR, payroll for cover-story, and logistics coordination. |
| Red-team / Counterintelligence | 3 | Internal audit and leak-prevention personnel; recurring costs included. |
| Drone Pilot / UAV Technician | 3 | Drone operations and maintenance; recurring ops included. |
| Site Director / Executive Staff | 1 | Senior leadership and decision authority for Area-508; salary included in staff_wages. |
| Class-D Personnel | 20 | On-site pool of D-Class maintained for Procedure 12-Norquay; procurement and logistics costs captured in one-time and recurring D-Class budgets. |
Confidence Notes
Estimates are low confidence because SCP-7913's anomalous behaviors (activation triggers, energetic yield, extradimensional effects) create large unknowns; many cost drivers (frequency of activations, scale of potential rupture, required national-level responses) are poorly constrained and could change required reserves by orders of magnitude.