SCP-7915
Unknown
?
low confidence
SCP-7915
Expected annual
$1.9M
One-time setup
$8.1M
Annual recurring
$1.9M
Personnel
14
Estimated start-up (one-time) costs are large due to monitoring network installation, research program setup and a recommended contingency reserve; recurring annual costs are driven by security and specialist staffing, monitoring upkeep, research operations and front-company maintenance.
One-Time Capital Costs
Total: $8.1M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with scheduled maintenance, staffing, routine monitoring and no major incidents.
routine_maintenance
scheduled_shipping
no_incident
🚨
Minor Incident
$2.2M/yr
Localized unauthorized playing or small-scale event causing 1 missing subject, minor structural damage and limited public exposure requiring PR/legal response.
unauthorized_playing
single_missing_subject
localized_property_damage
🚨
Major Incident
$3.4M/yr
Larger event with multiple disappearances, substantial infrastructure damage within the 20-mile radius and significant legal/cover costs.
multiple_missing_subjects
infrastructure_damage
multi-jurisdictional_response
🚨
Catastrophic Breach
$6.9M/yr
Major mass-effect event causing widespread structural damage, mass casualties/multiple disappearances and full drawdown of contingency reserves.
widespread_infrastructure_failure
mass_casualties
public_exposure
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] 24/7 armed guard coverage (three-shift rotation). |
| Research Scientist | 1 | [#4] Primary lead researcher (physicist/occult specialist). |
| Research Assistant | 1 | [#4] Research assistant supporting lead scientist. |
| Instrument Technician | 1 | [#19] In-house instrument conservation specialist assigned to Symphonic's / Site-115 liaison. |
| Symphonic Instrument Repair Tech | 1 | [#6] Foundation-owned front shop technician (Symphonic's). |
| Emergency Response Team (ERT) Agent | 4 | [#12] Rapid deployment team members (staffing/training budget included). |
Confidence Notes
Costs are based on wide ranges in the analyst notes (many per-incident and contingency estimates), uncertain frequency of major events and ambiguous staffing/cover allocations for fronts; contingency and research scope create large variance.