SCP-8000
Unknown
?
low confidence
SCP-8000
Expected annual
$563.5M
One-time setup
$13.4B
Annual recurring
$467.0M
Personnel
337
Initial capital requirements are dominated by a purpose-built containment complex and catastrophic-response reserves (total one-time ~13.4B USD); recurring annual costs are driven by staff, R&D/monitoring, and a large operational energy burden (~467M USD/year).
One-Time Capital Costs
Total: $13.4B
Annual Recurring Costs
Total: $467.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$467.0M/yr
Uneventful year with routine operations, monitoring, and steady R&D progress; no major breaches or escalations.
no_breach
routine_maintenance
ongoing_r&d
🚨
Minor Incident
$492.0M/yr
Localized gateway or limited phasing event causing equipment damage and small evacuations; manageable with onsite resources.
localized_gateway
equipment_damage
limited_evacuations
🚨
Major Breach
$1.5B/yr
Significant containment failure requiring military leasing/coordination, large-scale remediation and prolonged shutdown of systems.
sustained_breach
extensive_infrastructure_damage
large_scale_evacuations
🚨
Research Breakthrough Scale Up
$1.7B/yr
Major R&D breakthrough requires immediate scale-up (new facilities and rapid deployment of prototype containment), incurring large one-time and recurring costs.
successful_anti-phasing_prototype
rapid_infrastructure_scale_up
🚨
Catastrophic Breach
$10.5B/yr
Containment collapse with catastrophic infrastructure and ecological damage requiring full deployment of catastrophic response fund and multi-year reconstruction.
full_containment_collapse
widespread_infrastructure_loss
mass_evacuations
Personnel
337 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 80 | [#5] Quantum physicists, dimensional theorists, modeling staff and specialists involved in anti-phasing research and monitoring. |
| Security Officer / MTF Agent | 200 | [#6] 24/7 onsite security and quick-reaction forces trained for nonstandard threats and gateway events. |
| Engineer / Maintenance | 30 | [#1, #19] Structural, electrical and field-housing engineers responsible for containment systems and long-term maintenance. |
| Administrative Staff | 10 | [#11, #12] Administrative, legal liaisons and cover-story operations support. |
| Medical Officer | 5 | [#20] Medical and psychiatric support for staff exposed to high-stress operations and gateway interactions. |
| Site Director / Executive Staff | 2 | [#5] Senior management and executive oversight. |
| Specialized Consultants | 10 | [#3, #13] External consultants: national labs, aerospace firms, particle instrument specialists and ethics counsel (contracted expertise). |
Confidence Notes
Estimates are low-confidence due to extreme technical uncertainty (phasing/precognition), wide ranges provided by analysts, potential for single-event multi-billion costs, and reliance on contingency multipliers.