SCP-803
Euclid
~
medium confidence
SCP-803
Expected annual
$13.9M
One-time setup
$16.7M
Annual recurring
$13.1M
Personnel
61
Initial capital for a small program (8 small units + one carrier hangar) is roughly $16.7M driven by containment construction, hangar/retrofit costs and a contingency fund; recurring annual operations are roughly $13.1M driven by staffing, maintenance, surveillance and covert operations.
One-Time Capital Costs
Total: $16.7M
Annual Recurring Costs
Total: $13.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.1M/yr
Normal operational year with routine maintenance, research, surveillance and no containment failures.
no_breach
routine_operations
scheduled_research
🚨
Minor Incident
$14.6M/yr
Localized containment incident requiring an emergency field capture or limited remediation, medical response and local PR/legal action.
localized_breach
small_public_exposure
single_field_capture
🚨
Major Breach
$33.1M/yr
Multi-site or high-profile containment failure requiring mass remediation, large international operations, legal settlements and major PR cover-up.
multi_site_breach
mass_casualties
international_exposure
Personnel
61 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 48 | 6 guards per containment cell to cover 24/7 rotation for 8 cells (per-note staffing model). [#7] |
| Supervisor / ROE Officer | 3 | Shift supervisors/ROE officers to oversee security rotations and incident response. [#7] |
| Research Scientist / Technical Staff | 8 | Core research/technical team (engineers, roboticists, biohazard techs, behavioral researchers). [#8] |
| Engineer / Maintenance | 2 | Mechanical/electrical engineers for HVAC, hoists, generators and rapid repairs. [#8, #20] |
Confidence Notes
Estimates derived directly from analyst ranges and a defined program scale (8 small units + one carrier); uncertainty remains in number of instances, frequency of field operations and chosen reserve policies, so figures are medium-confidence.