SCP-8036
Exempt
~
medium confidence
SCP-8036
Expected annual
$4.8M
One-time setup
$26.8M
Annual recurring
$4.7M
Personnel
16
Modeled first-year capital option (purchase) requires large one-time capital for property and reserves (~$26.8M), with steady-state recurring operations of roughly $4.73M/yr. Main drivers are site acquisition/purchase, contingency/reserve funds, security staffing, and ongoing facilities/IT/research operations.
One-Time Capital Costs
Total: $26.8M
Annual Recurring Costs
Total: $4.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.7M/yr
Normal steady-state year with no major incidents; recurring operations only.
normal_operations
periodic maintenance
routine research
🚨
Minor Incident
$4.9M/yr
Small relocation, short redeployment, or low-impact public exposure requiring rapid response and limited remediation.
small_relocation
beacon_replacement
limited_public_exposure
🚨
Major Breach
$5.7M/yr
Containment-related incident causing structural/equipment damage, significant public exposure, or extended emergency operations.
structural_damage
large_public_exposure
equipment_loss
🚨
Relocation Event
$5.2M/yr
SCP resumes unpredictable relocation off-site/remote requiring rapid global tracking, satellite/air assets, redeployment and possible temporary site re-acquisition or lease.
unexpected_manifestation
long-distance_relocation
satellite_tasking
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | [#3] Three-shift coverage for 29,000 m² footprint; estimate matches 12–18 guard guidance (modeled as 15). |
| Evidence Technician / Archivist | 1 | [#24] Recurring evidence cataloging and archive staffing (database entry, chain-of-custody). |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs, allowing mid-point modeling; uncertainty remains in site acquisition choice (purchase vs lease), frequency/severity of relocation incidents, and the appropriate size of contingency reserves, so confidence is medium.