SCP-8059
Unknown
?
low confidence
SCP-8059
Expected annual
$4.3M
One-time setup
$13.9M
Annual recurring
$4.2M
Personnel
15
Initial one-time setup (~$13.9M) driven by specialized temporal sensing, global monitoring systems, contingency reserves and decommissioning planning; ongoing annual operations (~$4.19M/yr) driven primarily by staff wages (research, monitoring, security) and research/monitoring tooling.
One-Time Capital Costs
Total: $13.9M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Normal year with routine operations, testing, and no major incidents.
routine_testing
no_unexpected_tachyon_events
🚨
Minor Incident
$4.4M/yr
Localized unauthorized playback or small tachyon burst requiring limited remediation and forensic work.
unauthorized_playback
localized_timeline_divergence
🚨
Major Breach
$9.2M/yr
Sustained tachyon interference or containment lapse causing significant data loss and site-level remediation.
sustained_tachyon_burst
site_level_containment_breach
🚨
Catastrophic Breach
$34.2M/yr
Severe timeline alteration requiring large-scale remediation, multi-site coordination, and long-term mitigation.
large_scale_timeline_divergence
multi-site_remediation_required
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Technician / Analyst | 3 | [#5] 24/7 tachyon monitoring staffing (three 8-hour shifts). |
| Security Officer / MTF Agent | 4 | [#6] Level-2 security staffing to ensure at least one guard on duty with relief and supervision. |
| Research Scientist | 3 | [#12] Senior temporal physicists / lead researchers on the dedicated research team. |
| Lab Technician | 4 | [#12] Lab technicians and data analysts supporting experiments and maintenance. |
| Project Manager / Research Lead | 1 | [#12] Project manager responsible for experiments, protocol maintenance, and on-call coordination. |
Confidence Notes
Large uncertainty due to esoteric temporal technologies, wide analyst ranges for sensor and monitoring system costs, and discretionary choices around contingency reserve sizing and global monitoring sensitivity.