SCP-8063
Euclid
~
medium confidence
SCP-8063
Expected annual
$1.3M
One-time setup
$1.0M
Annual recurring
$1.3M
Personnel
12
One-time capital setup of approximately $1,009,500 driven by containment construction, HVAC/life-support and specialized observation equipment; ongoing annual operating costs are approximately $1,298,500/yr, dominated by personnel (security + technical + research) and recurrent maintenance/supplies.
One-Time Capital Costs
Total: $1.0M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal operating year with no major incidents; routine maintenance, staffing, research and consumables proceed as planned.
no incidents
routine maintenance
normal research cadence
🚨
Minor Incident
$1.4M/yr
Small in-cell damage or limited contamination event requiring repairs, overtime and modest replacement of in-cell items.
replica destruction
localized contamination
overtime & small repairs
🚨
Major Breach
$1.7M/yr
Significant destructive behavior requiring major repairs, temporary relocation, large replacement of containment hardware and extensive incident response.
destructive containment breach
replacement of one-way glass and structural repairs
extended emergency response
🚨
Research Breakthrough Requiring Scale Up
$1.9M/yr
Active decision to scale research aggressively (pursue ruins link, add research FTEs and equipment) resulting in materially higher annual costs.
active field expeditions
addition of 3–5 research FTEs
purchase of specialized equipment
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] Six full-time guards to meet 2-per-shift coverage across three shifts. |
| Security Supervisor | 1 | [#8] One shift/site supervisor coordinating security for SCP-8063. |
| Technical / Animal Care | 2 | [#9] Two aquaculture/animal techs for feeder maintenance, water quality, and routine checks. |
| Research Scientist | 2 | [#10] Xenobiologist and memetics/psychology researcher (combined ~1.5 FTE; rounded to 2 personnel for staffing). |
| Analyst / Administrative (part-time) | 1 | [#10] Part-time analyst/administrative support allocated to experiments and incident review. |
Confidence Notes
Analyst notes provide detailed line-item estimates for capital and recurring items, so cost magnitudes are reasonably well constrained; uncertainty remains in incident frequencies, optional high-cost research activity, and repair/replacement volatility, hence medium confidence.