SCP-8074
Unknown
~
medium confidence
SCP-8074
Expected annual
$2.9M
One-time setup
$4.0M
Annual recurring
$2.8M
Personnel
23.4
Initial capital/refit and equipment are the main one-time costs (~$3.96M) for wing conversion, HVAC/filtration, waste-handling and emergency reserves; recurring operations (staffing, consumables, utilities, research, insurance and contingencies) are the primary ongoing cost drivers (~$2.85M/yr).
One-Time Capital Costs
Total: $4.0M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal uneventful year with steady operations, no major incidents.
stable population behavior
no major containment incidents
regular maintenance and staffing
🚨
Minor Incident
$3.0M/yr
Localized incident(s): mass soiling event, limited escape attempt contained quickly, short-term increased overtime and disposal/cleanup.
mass soiling / hygiene outbreak
small-scale containment breach
increased overtime and cleanup contracts
🚨
Major Breach
$4.3M/yr
Significant containment breach or multi-instance incident requiring emergency response, facility repairs, litigation and major reserve drawdown.
major multi-instance breach
public exposure / litigation
facility damage and large-scale remediation
Personnel
23.4 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#8] 24/7 guard coverage for the wing (chosen mid-range staffing). |
| Security Supervisor | 1 | [#8] Supervisory role included in security staffing estimates. |
| Janitorial Personnel | 5 | [#4] Increased janitorial FTEs trained for biohazard cleanup (midpoint of 3–6 FTE). |
| Mental Health Clinician / Case Worker | 3 | [#7] Clinicians for mandatory counseling and reintegration assessments (midpoint of 2–4 FTE). |
| Medical Officer / Nurse | 1 | [#6] Full-time nurse for routine screening and treatment. |
| Physician Consultant | 0.4 | [#6] Part-time physician consultant (0.25–0.5 FTE as noted). |
| Data Analyst / Behavioral Reviewer | 1 | [#14] Analyst(s) to code behaviors, review video and support research (0.5–1 FTE; mid/operational need set to 1). |
Confidence Notes
Costs are based on midpoints of analyst-provided ranges and a detailed line-item breakdown; uncertainty remains due to optional alternatives (on-site incinerator vs. contract disposal), behavior-driven incident frequency, and the unknown object class/behavioral escalation risk.