SCP-808
Euclid
~
medium confidence
SCP-808
Expected annual
$3.2M
One-time setup
$8.6M
Annual recurring
$3.2M
Personnel
38
Initial capital outlay is approximately $8.63M driven by site construction, containment tank/foam, specialized defensive installations and contingency reserves; steady-state annual operating costs are about $3.19M driven primarily by security wages, recurring inspections/monitoring, research and specialist contractors.
One-Time Capital Costs
Total: $8.6M
Annual Recurring Costs
Total: $3.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.2M/yr
Normal year with scheduled maintenance, monitoring, research and no containment incidents.
scheduled_inspections
routine_research
no_incidents
🚨
Minor Incident
$3.4M/yr
Localized high-dB event causing on-site injuries or limited property damage requiring repairs, medical care and minor legal/compensation costs.
localized_scream
minor_property_damage
medical_treatment
🚨
Major Breach
$4.7M/yr
A significant uncontrolled 'scream' causing deaths/injuries and substantial property damage requiring rapid repairs, legal settlements and reserve replenishment.
direct_damage_to_humanoid_construct
off-site_property_damage
multiple_injuries_or_fatalities
🚨
Catastrophic Breach
$8.2M/yr
Large-scale high-dB event with extensive off-site casualties and infrastructure damage consuming contingency reserves and triggering prolonged remediation/legal actions.
full_scale_scream
multi-site_damage
major_loss_of_life
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#7] Rotating armed guards and supervisors to provide 24/7 coverage (estimate per note: 12–24; 20 used here). |
| Class-D Personnel | 12 | [#5, #6] Expendable maintenance labour for risky maintenance tasks and dampener replacement; includes admin/escort overhead. |
| Research Scientist / Acoustical Engineer | 4 | [#18] R&D team for acoustics/materials testing and mitigation (staffing funded within recurring R&D budget). |
| Medical Officer | 2 | [#16] On-site medics/audiometry and occupational health support (1–2 FTE referenced; 2 used). |
Confidence Notes
Analyst notes provide detailed line-item ranges enabling a mid-confidence consolidated estimate, but wide ranges for contingency items, local construction costs and incident frequencies keep confidence from being high.