SCP-8101
Unknown
~
medium confidence
SCP-8101
Expected annual
$1.7M
One-time setup
$1.9M
Annual recurring
$1.6M
Personnel
12
Initial one-time containment and R&D setup is approximately $1.91M, with ongoing annual operations around $1.61M; main drivers are personnel (security + research) and recurring specialized R&D/forensic/legal support, with large one-time R&D and reserve funding also significant.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal operational year with routine monitoring, no major incidents.
no incidents
standard testing suspended
routine maintenance
🚨
Minor Incident
$1.8M/yr
Localized incident (e.g., a hazardous dispensed item discovered, limited exposure) requiring extra forensics, amnestics, and limited legal/medical response.
hazardous dispensed item
small civilian exposure
increased forensic work
🚨
Major Breach
$2.6M/yr
Partial breach or site compromise forcing relocation, large-scale containment response, public suppression and legal expenses.
site compromise
multiple civilian exposures
MTF deployment and relocation
🚨
Catastrophic Breach
$6.6M/yr
Major public exposure or catastrophic legal/settlement event with long-term reputational and operational costs.
widespread public exposure
large litigation/settlement
major political/legal fallout
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#2] Six full-time guards (rotation to provide 24/7 coverage; salary estimates per-note). |
| Security Supervisor | 1 | [#2] One site security supervisor for oversight (~$85k/yr salary included in staff_wages). |
| Research Scientist (Senior / PI) | 1 | [#3] One senior researcher (PI) responsible for oversight and testing. |
| Research Scientist (Junior) | 2 | [#3] Two junior researchers supporting monitoring and analysis. |
| Technician / Engineer | 1 | [#3] One technician/engineer for maintenance and equipment support. |
| Research Nurse / Medic | 1 | [#3, #9] One medic/research nurse for subject readiness and emergency response. |
Confidence Notes
Line items are derived directly from analyst estimates in the notes; personnel and recurring costs are well-specified but R&D, incident frequency, and reserve sizing are uncertain, producing medium confidence overall.