SCP-8120
Unknown
~
medium confidence
SCP-8120
Expected annual
$21.2M
One-time setup
$77.8M
Annual recurring
$20.6M
Personnel
62
One-time startup costs are approximately $77.9M driven largely by a contingency reserve, Site-01 vault construction, vessel purchase/refit and program seed; recurring annual costs are roughly $20.6M driven by staff wages, contingency allocations, and ongoing research/operations.
One-Time Capital Costs
Total: $77.8M
Annual Recurring Costs
Total: $20.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$20.6M/yr
Normal year with containment-only posture — no large-scale incidents or active program pursuits.
routine_operations
periodic archival rotations
🚨
Minor Incident
$22.6M/yr
Localized activation or exposure requiring MTF response, limited PR/legal action and artifact stabilization.
single-artifact activation
small estate leak
accidental exposure
🚨
Major Breach
$80.6M/yr
Large containment breach or partial activation of SCP-8120 resulting in wide MTF mobilization, large-scale evacuations and international operations.
simultaneous multiple activations
estate compromise with public exposure
uncontrolled ritual activation
🚨
Research Breakthrough Scaleup
$30.6M/yr
Foundation elects to actively pursue SCP-8120-B/Rotten Core access (vessel ops, candidate program ramp-up, scaled experiments).
decision to pursue controlled trials
vessel deployment and crew expansion
candidate recruitment and sustained experiments
Personnel
62 total
| Role | Count | Notes |
|---|---|---|
| Mobile Task Force / MTF Agent | 25 | [#8] Dedicated rapid-response team(s) for artifact seizure, ritual interdiction and vessel operations; count reflects 20–30 operatives. |
| Security Officer / Guard | 20 | [#9, #5] 8–12 guards per storage location; two primary locations (Site-01 vault + Hadfield estate) assumed; includes shift coverage. |
| Research Scientist | 6 | [#11] Specialists (archaeology, history, ritualists/occult scholars) to interpret notes and design safe study protocols. |
| Conservator / Lab Technician | 4 | [#3] Two conservators, one cataloger, one lab tech for conservation, cataloging and duplicate production. |
| Administrative Staff | 3 | [#4, #17] Site/admin support, legal liaison and records management for restricted documents and cover operations. |
| Engineer / Maintenance | 2 | [#1, #21] Facilities, HVAC, environmental control, generator maintenance for vaults and estates. |
| Medical Officer / Psychological Staff | 2 | [#10, #27] Medical and psychiatric contingency staff for operatives and any exposed personnel; ongoing monitoring. |
Confidence Notes
Mid-range estimates used where analyst provided wide ranges; major drivers (contingency reserve, vessel purchase, MTF staffing) are well-identified but optional programs and catastrophic scenarios introduce substantial variance, so confidence is medium.