SCP-8129
Unknown
~
medium confidence
SCP-8129
Expected annual
$1.4M
One-time setup
$5.4M
Annual recurring
$1.3M
Personnel
9
Estimated upfront one-time costs are approximately $5.42M driven primarily by contingency/reserve funds, containment chamber construction, quarantine greenhouse and transport/installation. Annual recurring operating costs are approximately $1.31M/year driven by personnel wages, research, administrative overhead and utilities/maintenance.
One-Time Capital Costs
Total: $5.4M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal, uneventful year with routine operations, scheduled maintenance, research and no major incidents.
scheduled maintenance
routine research
no containment incidents
🚨
Minor Incident
$1.5M/yr
Limited containment incident (single unauthorized exposure, small propagation event, or an isolated suicide) requiring targeted response, medical/psychological care, limited legal/PR and cleanup.
single exposure incident
unauthorized cutting found
minor public tip-off requiring local PR
🚨
Major Breach
$3.8M/yr
Significant containment failure with multiple casualties/exposures, public exposure and litigation requiring large-scale remediation and contingency fund drawdown.
containment breach
multiple suicides/exposures
public disclosure/litigation
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#10] Dedicated security (4 FTE guards as noted for rotating 24/7 coverage). |
| Horticulturist / Technician | 3 | [#11] One dedicated horticulturist + two technicians for daily checks and maintenance. |
| Research Scientist / Containment Scientist | 1 | [#12] At least one containment scientist responsible for anomalous behaviour research. |
| Psychologist | 1 | [#12] Psychologist assigned (noted as part-time for the object but counted as one available staff member for entries and follow-up). |
Confidence Notes
Estimates are based on line-item analyst notes with specific numerical estimates for most categories, but several contingency/long-tail costs (containment-failure reserve, decommissioning) have wide ranges and uncertain probabilities for adverse events, yielding medium confidence.