SCP-8138
Unknown
~
medium confidence
SCP-8138
Expected annual
$692K
One-time setup
$619K
Annual recurring
$653K
Personnel
6
Initial one-time setup is moderate (~$619k) driven by cell/garden construction, transport/recovery, and contingency reserves; annual recurring costs are approximately $653k/yr driven primarily by staff wages, emergency readiness, and cover-story/legal maintenance.
One-Time Capital Costs
Total: $619K
Annual Recurring Costs
Total: $653K/yr
Cost Scenarios
📊
Baseline
(baseline)
$653K/yr
Normal uneventful year with standard monitoring, staffing, garden access and routine maintenance.
no incidents
routine operations
🚨
Minor Incident
$773K/yr
Localized equipment failure or minor medical incident requiring short MTF activation, repairs, and limited legal/cover response.
sensor/NVR failure
minor medical anomaly requiring MTF overtime
🚨
Major Breach
$1.2M/yr
Significant containment failure or relocation requiring extended MTF operations, site-level lockdown, relocation, and heavy legal/cover actions.
containment breach
forced relocation/decommissioning
🚨
Research Scale Up
$953K/yr
Authorization of expanded research program requiring added staff, equipment upgrades, and higher-frequency testing.
ethical approval for invasive studies
granting of expanded research mandate
🚨
Political Exposure
$853K/yr
Public/political exposure requiring intensive legal, PR and payoff expenditures to maintain cover and manage fallout.
media leak
local government scrutiny
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#8] Two Level‑2 guards dedicated/assigned across schedule for garden supervision and containment interaction. |
| Security Monitor | 1 | [#9] Fractional allocation equivalent to one FTE security/CCTV monitor charged to SCP-8138. |
| Research Scientist | 1 | [#11] Principal Investigator responsible for oversight of monitoring and experiments. |
| Research Technician | 2 | [#11] One to two research assistants/technicians for daily logs, non-invasive tests and data handling. |
Confidence Notes
Estimates are order-of-magnitude midpoints derived from analyst ranges and the SCP text; core recurring drivers (staff, readiness, cover) are well-identified but contingency and decommissioning costs are highly uncertain, so confidence is moderate.