SCP-8152
Unknown
~
medium confidence
SCP-8152
Expected annual
$80K
One-time setup
$90K
Annual recurring
$77K
Personnel
5
Upfront one-time capital of approximately $90,000 driven primarily by construction of a soundproof testing chamber, acrylic soundproofing, and contingency reserves; annual operating costs are approximately $76,700 driven by fractional staff wages, psychological screening/treatment, and ongoing research/monitoring.
One-Time Capital Costs
Total: $90K
Annual Recurring Costs
Total: $77K/yr
Cost Scenarios
📊
Baseline
(baseline)
$77K/yr
Uneventful year with routine research, husbandry, screenings, and maintenance; no containment incidents requiring major response.
routine monitoring and testing
scheduled psychological screenings
normal husbandry and maintenance
🚨
Minor Incident
$87K/yr
Small on-site containment breach or disturbance requiring local response, short-term overtime, counseling for exposed staff, and minor public mitigation.
localized escape within site
short-term luring/retrieval operation
minor staff exposure requiring counseling
🚨
Major Breach
$137K/yr
Significant breach with public visibility or prolonged retrieval effort requiring extensive cover story, legal action, multi-team response, and escalation of research/containment.
public sighting/viral social media
multi-day retrieval and public mitigation
external legal involvement
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Lead Researcher | 1 | [#10] One lead researcher assigned (fractional FTE ~0.1–0.3 of their time dedicated to SCP-8152). |
| Research Assistant / Technician | 1 | [#10, #11] One part-time research assistant/tech to support behavioral testing and equipment operation. |
| Animal Caretaker / Husbandry | 1 | [#9, #17] Single part-time caretaker (0.1–0.3 FTE) for feeding, cleaning, and basic observations. |
| Security Officer / MTF Agent | 2 | [#11, #19] Two qualified attendants available for two-attendee policy during tests and to support incident response rotations (fractional allocations of their time). |
Confidence Notes
Procedures and required items are well-documented, enabling reasonable estimates for construction and staffing, but ranges provided in analyst notes are broad (especially for incident response and contingency escalation), producing moderate uncertainty.