SCP-8174
Unknown
?
low confidence
SCP-8174
Expected annual
$21.4M
One-time setup
$434.4M
Annual recurring
$19.6M
Personnel
113
Estimated one-time capital costs are approximately $434,400,000 driven by site acquisition/preparation, heavy fabrication/drydock capability, hull integration and propulsion systems, cooling, and large contingency reserves; recurring annual costs are approximately $19,650,000 driven primarily by specialized staff wages, maintenance (cooling, corrosion, spare parts), support-vessel operations and legal/black-budget replenishment.
One-Time Capital Costs
Total: $434.4M
Annual Recurring Costs
Total: $19.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$19.6M/yr
Normal operational year with scheduled maintenance, staffing rotations, routine consumables and no major incidents.
steady-maintenance
no-breaches
routine-ops
🚨
Minor Incident
$21.6M/yr
Localized failure or small containment/operational incident requiring repairs, short-term surge staffing, legal/PR activity and limited environmental remediation.
localized-failure
small-breach
equipment-damage
🚨
Major Breach
$94.7M/yr
Significant containment breach, major structural/hull damage, or a catastrophic failure requiring large-scale salvage, decommissioning work, legal settlements and replacement of major systems.
catastrophic-failure
large-scale-breach
environmental-release
Personnel
113 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 80 | [#15] MTF Alpha-1 rotational/security contingent aboard the Ark and at the shipyard. |
| Level-4 Maintenance Specialist | 8 | [#14] Biweekly Level-4 maintenance roster performing hands-on inspections and servicing. |
| Engineer / Maintenance | 12 | [#3, #6, #11] Shipyard engineers, machinists and maintenance crew for heavy-lift, hull integration and machine-shop operations. |
| Research Scientist | 6 | [#19, #25] Instrumentation/data analysts and research staff monitoring anomalous outputs and archiving logs. |
| Medical Officer | 2 | [#18] On-site medical staff for sickbay, decon and routine medical care. |
| Administrative Staff | 4 | [#25, #20] Administrative, legal liaison and records/RAISA support for archiving and cover operations. |
| Site Director / Executive Staff | 1 | [#28] Chief Marine Engineer / site lead responsible for operations and O5 reporting oversight. |
Confidence Notes
Estimates have low confidence due to wide ranges in the analyst notes, major technical unknowns (mass/installation complexity), location-specific variables, and potential unbounded anomalous costs; contingency and reserve estimates are judgment calls.