SCP-8177
Safe
~
medium confidence
SCP-8177
Expected annual
$7.5M
One-time setup
$21.6M
Annual recurring
$7.3M
Personnel
30
Estimated one-time setup is roughly $21.6M driven by production tooling, Athena hardware, and site construction; annual recurring costs are about $7.2M driven by staff wages, Athena operations, research, and per-session consumables.
One-Time Capital Costs
Total: $21.6M
Annual Recurring Costs
Total: $7.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.3M/yr
Normal operational year with no major incidents; recurring costs only.
routine_sessions
scheduled_maintenance
regular_research
🚨
Minor Incident
$8.0M/yr
Localized adverse event (medical complication, equipment failure, small data leak) requiring additional medical treatment, replacement parts, limited legal action and extra transport.
medical_emergency
single-site_equipment_failure
limited_exposure_incident
🚨
Major Breach
$15.2M/yr
Significant containment/security breach or high-profile exposure requiring large-scale retrieval, legal/PR response, replacement of multiple units and extended hospitalization/research.
public_exposure
coordinated_breach
international_retrieval
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Neurophysician | 3 | [#7] Senior neurophysicians to design/oversee procedures and interpret neural data. |
| Anesthetist / Medical Officer | 3 | [#7, #9] Anesthetists/ER physicians on-call for procedures and emergencies. |
| EEG Technician | 6 | [#7, #17] Technicians to attach electrodes, run sessions, and perform equipment maintenance. |
| Psychiatrist / Psychologist | 2 | [#7, #11, #19] For pre/post session evaluation, therapy and post-processing/amnestic oversight. |
| Security Officer / MTF Agent | 6 | [#8] Level-2/3 guards for operation oversight, storage security and transport escorts. |
| Data Scientist / ML Engineer | 4 | [#4, #15] Engineers maintaining Athena.V13, model retraining and validation. |
| Transcript Review / Memetic Specialist | 3 | [#14] Secure transcript redaction and memetic analysis teams. |
| Engineer / Maintenance | 2 | [#3, #16, #17] Facilities and equipment maintenance staff (shielding, HVAC, UPS, repairs). |
| Administrative Staff | 1 | [#13, #23] Admin, legal liaison and oversight support for cover stories and committees. |
Confidence Notes
Estimates are order-of-magnitude based on ranges provided; scope (centralized vs fully provisioned 80-site rollout) creates large variance. Many costs are scenario-dependent and some items (per-mission retrievals, destruction events) are episodic, reducing precision.