SCP-8208
Safe
~
medium confidence
SCP-8208
Expected annual
$384K
One-time setup
$5.4M
Annual recurring
$368K
Personnel
0.6
Baseline one-time capital is dominated by a conditional large aquatic-build contingency; routine annual costs are mid-six-figures driven by technician/vet labor, sequencing, necropsy consumables, and legal/cover expenses.
One-Time Capital Costs
Total: $5.4M
Annual Recurring Costs
Total: $368K/yr
Cost Scenarios
📊
Baseline
(baseline)
$368K/yr
Routine year with weekly Delphinidae-sized specimens, scheduled necropsies, targeted sequencing, and regular transport to cannery; no major incidents or upscaling.
weekly specimen recovery
routine testing and disposal
no size escalation
🚨
Minor Incident
$388K/yr
Ad-hoc heavy-lift or transport incident requiring crane/forklift rental and extra logistics/vet time (no structural upgrades).
unexpected large specimen handling
one-off crane/forklift rental
increased necropsy/logistics that year
🚨
Large Upscale Response
$788K/yr
Appearance of substantially larger specimens requiring emergency response equipment rentals, expanded veterinary support, and use of contingency reserve for short-term containment and transport.
detection of whale-sized specimen
emergency heavy-lift & temporary containment
rapid logistics & contract mobilization
🚨
Major Expansion
$6.4M/yr
Determination that SCP can produce much larger cetaceans requiring construction of a reinforced aquatic containment facility and first-year operations.
confirmed production of large whales/narwhals
failure of temporary measures
decision to build permanent aquatic containment
Personnel
0.6 total
| Role | Count | Notes |
|---|---|---|
| Biological Technician | 0.35 | Part-time technician (~0.25–0.5 FTE) performing weekly checks, necropsy prep, specimen handling. Cost included in staff_wages. [#5] |
| Veterinary / Pathologist (contract) | 0.25 | Part-time contract vet/pathologist oversight for necropsies (0.2–0.3 FTE equivalent). Cost included in staff_wages. [#6] |
Confidence Notes
Notes provide detailed cost ranges for routine operations and contingencies, allowing a reasoned mid-confidence estimate; large-scale contingency figures (multi-million buildouts) are highly uncertain which lowers overall confidence.