SCP-8214
Unknown
~
medium confidence
SCP-8214
Expected annual
$2.8M
One-time setup
$11.9M
Annual recurring
$2.7M
Personnel
14
Estimated one-time implementation and contingency reserves are approximately $11.94M, driven primarily by contingency/proliferation reserves and initial R&D/storage buildout; recurring annual costs are approximately $2.66M/yr, driven by staff wages, surveillance/casework and contingency task-force readiness.
One-Time Capital Costs
Total: $11.9M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal year: containment operations, scheduled testing at low cadence, routine monitoring and maintenance with no major incidents.
no unauthorized execution
limited routine testing
no public incidents
🚨
Minor Incident
$3.0M/yr
Localized unauthorized execution or accidental exposure requiring emergency containment, short-term public-messaging and targeted cover-up.
unauthorized execution
small breach
one or two public-exposure risks
🚨
Proliferation Event
$12.7M/yr
ATROPOS.EXE copies or spreads externally, producing many SCP-8214-B instances and large-scale public exposure requiring nationwide containment and long-term mitigation.
unauthorized propagation
widespread copying
high-profile public incidents
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] 24/7 guard contingent for locker/site security (4-8 recommended; mid-range used). |
| Research Scientist | 2 | [#4, #20] Researchers for forensic analysis, R&D on neutralization and running controlled tests. |
| Software Engineer / DBA | 1 | [#11] Maintain Prophetics database, server ops and secure indices (FTE wages included in staff_wages). |
| Caseworker / Field Agent | 2 | [#9] Monitoring and surveillance caseworkers for tracked SCP-8214-B instances. |
| Medical Officer | 1 | [#10] Manage autopsies, pathology liaison and medical study of SCP-8214-C instances. |
| Engineer / Maintenance | 1 | [#6, #18] Maintain test chamber, robotic systems, climate control and site infrastructure. |
| Administrative Staff | 1 | [#25] Procurement, accounting and administrative support for inter-site logistics and record-keeping. |
Confidence Notes
Estimates are built from analyst ranges in the notes; many line-items are broad ranges (especially incident/cover-up and proliferation reserves) so totals are approximate. Core operational costs (storage, workstation, guards, database, surveillance) are well-specified; contingency/proliferation estimates are inherently uncertain.