SCP-8274
Unknown
?
low confidence
SCP-8274
Expected annual
$51.8M
One-time setup
$101.5M
Annual recurring
$50.0M
Personnel
254
Estimated one-time capital and R&D needs are approximately $72.3M, driven by civil works, deep-access installation and a large catastrophic reserve. Annual operating costs are dominated by security staffing and local mitigation/cover payments, totaling roughly $50.0M/year.
One-Time Capital Costs
Total: $101.5M
Annual Recurring Costs
Total: $50.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$50.0M/yr
Normal year with no major incidents; routine operations, monthly excursions and normal replacement/maintenance.
no major incidents
scheduled excursions only
steady-state staffing and maintenance
🚨
Minor Incident
$51.5M/yr
Localized equipment loss or medical/rescue incident requiring expedited replacement and emergency response.
equipment destruction during imaging
single casualty or extraction
expedited replacement and medevac charters
🚨
Major Breach
$60.0M/yr
Significant containment breach or attack on Site-39 requiring large-scale recovery, replacement, and legal/medical response.
armed engagement at perimeter
multiple casualties or major infrastructure damage
extended recovery and rebuild operations
🚨
Political Exposure
$80.0M/yr
Political/legal exposure or forced large-scale economic mitigation causing multi-million annual payouts and reputational containment operations.
public disclosure or legal challenge forcing mining compensation
regional political pressure
major FOIA/legal escalation
Personnel
254 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 165 | [#1] Perimeter staffing to maintain a constant perimeter of no less than 50 personnel requires multi-shift coverage (165 = midpoint staffing estimate). |
| Research Scientist | 50 | [#3, #11] Linguists, archaeologists, geologists and specialist researchers (midpoint estimate of 40–60). |
| Engineer / Maintenance | 10 | [#5, #16] Structural, elevator/hoist, and site maintenance engineering staff for deep-access and civil works upkeep. |
| Medical Officer | 6 | [#13] On-site emergency medical and psychological support staff (multidisciplinary medevac readiness). |
| Administrative Staff / Site Director / Executive Staff | 8 | [#3, #21] Site leadership, administration, legal liaison and compliance staff. |
| Artists / Draftspeople | 9 | [#10] Manual recreation and documentation team (midpoint 6–12). |
| Data / AI Specialists | 6 | [#9] warehouse.aic operators, data scientists and IT/sysadmin to run secure compute and analyses. |
Confidence Notes
Wide ranges in the analyst notes (especially item #17: local mitigation/cover costs) and the anomalous failure modes of equipment create high uncertainty; many line items are order-of-magnitude estimates rather than measured budgets.