SCP-8298
Unknown
~
medium confidence
SCP-8298
Expected annual
$16.6M
One-time setup
$38.8M
Annual recurring
$16.5M
Personnel
25
Initial one-time setup is large due to facility hardening, specialized R&D, containment cells and amnestic development; total one-time costs are dominated by facility construction and amnestic development. Recurring costs are driven by staffing, legal/cover operations and a maintained contingency reserve for mass-fatality events.
One-Time Capital Costs
Total: $38.8M
Annual Recurring Costs
Total: $16.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$16.5M/yr
Normal year with steady operations, no major incidents; recurring costs only.
no activation
routine maintenance
normal staffing and training
🚨
Minor Incident
$17.5M/yr
Localized activation requiring targeted response: small casualties, targeted amnestic deployment, investigation.
small relay activation
localized SCP-8298-1 instances
limited amnestic deployment
🚨
Major Breach
$41.5M/yr
Large-scale activation / mass-fatality event similar to initial incident requiring mass-fatality handling, mass amnestics, legal/PR operations and large contingency drawdown.
systemwide uncontrolled activation
mass casualties (thousands)
large-scale amnestic and disposal operations
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | [#10, #11] Senior psionic researchers responsible for experiments, modeling and oversight. |
| Engineer / Maintenance | 2 | [#7, #4] Engineers maintaining robotic tooling, backup power and facility systems. |
| Containment Specialist | 2 | [#8, #11] Containment operators and psi-safety specialists handling SCP-8298-1 instances. |
| Security Officer / MTF Agent | 12 | [#12] 24/7 armed coverage, perimeter teams and guard rotations. |
| Site Director / Executive Staff | 1 | [#11, #19] Leadership and liaison to Foundation departments and legal. |
| Medical Officer | 2 | [#15] On-site medics and trauma readiness staff. |
| Administrative Staff | 2 | [#19, #25] Logistics, scheduling, procurement and record-keeping support. |
Confidence Notes
Analyst notes provide detailed line-item ranges, but many costs (probabilities, mass-fatality per-event costs, amnestic development) are highly uncertain for an anomalous psionic system; estimates use mid-range assumptions where ranges were wide.