SCP-8302
Unknown
~
medium confidence
SCP-8302
Expected annual
$1.0M
One-time setup
$10.1M
Annual recurring
$517K
Personnel
3
One-time capital outlay is approximately $10.1M driven mainly by the MELVILLE expedition (vessel charter), hydrophone buoy deployment and specialized equipment, staffing and amnestic program costs. Baseline recurring operations (neutralized status) are modest at about $0.52M/yr driven by mental-health follow-up, archival/IT maintenance and occasional hydrophone checks.
One-Time Capital Costs
Total: $10.1M
Annual Recurring Costs
Total: $517K/yr
Cost Scenarios
📊
Baseline
(baseline)
$517K/yr
Neutralized status — limited follow-up, archival maintenance, occasional hydrophone checks and mental-health monitoring.
confirmed neutralized
only follow-up monitoring required
no active field deployments
🚨
Active Monitoring
$3.3M/yr
Program resumed to active multi-year monitoring and annual expedition cycle (buoy maintenance, seasonal expeditions, expanded staff and security).
reappearance of anomalous calls
decision to run annual MELVILLE-style expeditions
requirement to maintain and operate full buoy array
🚨
Minor Incident
$1.3M/yr
Single-year reactive response: one emergency expedition, limited legal/PR payouts and targeted necropsy/research work.
local sighting or public report
isolated adverse medical events
small-scale media exposure
🚨
Major Breach
$5.5M/yr
Large-scale exposure or complicated neutralization aftermath requiring major expedition, environmental remediation, large legal settlements and diplomatic mitigation.
public/media leak of evidence
severe adverse reactions requiring hospitalization
international/diplomatic incident
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | [#4,#5] Lead scientist overseeing archival analysis and program oversight; part-time in neutralized baseline. |
| Signal Analyst / Acoustic Engineer | 1 | [#4] Ongoing analysis of hydrophone data and spectrogram processing. |
| Administrative Staff / Operations Coordinator | 1 | [#13,#15] Administrative coordination, legal liaison, logistics and training coordination for baseline follow-up activities. |
Confidence Notes
Mid-range confidence: analyst notes provide concrete historical expedition and plausible cost ranges, but many line items have wide ranges (vessel charter duration, buoy scale, amnestic program scope) and outcomes depend heavily on whether the anomaly remains neutralized. Estimates are therefore order-of-magnitude and subject to significant variance.