SCP-8351
Uncontained/Keter
~
medium confidence
SCP-8351
Expected annual
$9.9M
One-time setup
$17.2M
Annual recurring
$8.9M
Personnel
16
Initial capital outlays are dominated by secure lab construction, contingency reserves, and diplomatic/site acquisition (~$17.2M one-time). Annual operating costs for personnel, long-term R&D, and ongoing containment logistics/monitoring drive a ~ $10.0M/year baseline.
One-Time Capital Costs
Total: $17.2M
Annual Recurring Costs
Total: $8.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.9M/yr
Routine year with scheduled replacements, research operations, and no major incidents or breaches.
scheduled_platform_replacement
routine_research_and_maintenance
🚨
Minor Incident
$10.5M/yr
Localized breach or increased emergence event requiring additional MTF mobilization, medevac, targeted replacement/repairs and temporary PR/legal activity.
localized_containment_breach
increased_emergence_activity
🚨
Major Breach
$20.0M/yr
Significant containment failure requiring large-scale mobilization, use of contingency reserves, international cover-up operations and accelerated R&D to re-contain or neutralize.
full_containment_failure
international_attention
mass_emergence_event
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | [#19] Senior scientists covering xenobiology, entomology, pathology; salary portion of staff_wages. |
| Research Technician | 4 | [#19] Lab technicians, sample processing and routine assay support included in staff_wages. |
| Site Director / Executive Staff | 1 | [#19] Program/site manager drawn from staff_wages. |
| Engineer / Maintenance | 2 | [#19] Structural/materials engineer and maintenance lead for platforms/systems. |
| Security Officer / MTF Agent | 4 | [#19] On-call security complement; salaries drawn from staff_wages (does not include episodic deployment costs captured elsewhere). |
| Administrative Staff | 1 | [#19] Administrative/coordination support included in staff_wages. |
Confidence Notes
Analyst notes are detailed with ranges and cover most cost drivers, but wide uncertainty remains due to unpredictable anomalous behavior, geopolitical opacity and option-driven alternatives (purchase vs lease, level of diplomatic buy-in), so estimates are medium confidence.