SCP-836
Keter
~
medium confidence
SCP-836
Expected annual
$15.0M
One-time setup
$12.4M
Annual recurring
$11.1M
Personnel
35
Initial capital outlay is roughly $12.44M for a single-site containment and lab setup; recurring baseline operations are ~ $11.07M/yr. Major cost drivers are staff wages, ongoing research/monitoring, outbreak response reserves, and large one-off policy/mitigation programs if enacted.
One-Time Capital Costs
Total: $12.4M
Annual Recurring Costs
Total: $11.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.1M/yr
Normal year with routine operations, maintenance, research and readiness reserves; no outbreak or policy-scale mitigation enacted.
no_incident
routine_operations
🚨
Minor Incident
$12.6M/yr
Localized inner-casing breach or small outbreak requiring room-level thermal treatment, limited evacuation, targeted monitoring and cover-up.
inner_casing_breach
localized_proliferation
minor_evacuations
🚨
Major Breach
$61.1M/yr
Widespread proliferation into utilities or multiple structures requiring large-scale evacuations, long-area monitoring, demolition and major remediation.
widespread_proliferation
contact_with_water_networks
major_structural_failures
🚨
Policy Mitigation Enacted
$121.6M/yr
Government/authority adopts large-scale mitigation: city-building retrofits, sensor roll-out and replacement of aging structures.
policy_decision
large_scale_mitigation
building_code_changes
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#12] Materials science/chemistry/microbiology scientists to run experiments and analysis. |
| Laboratory Technician | 6 | [#12] Full-time technicians for sampling, maintenance, sterilization and instrument prep. |
| Security Officer / MTF Agent | 20 | [#13] 24/7 security roster with hazmat/CBRNE training and rapid-response capability. |
| Site Director / Executive Staff | 1 | [#12, #13] Program/operations lead overseeing containment. |
| Medical Officer | 1 | [#12, #13] On-call medical support for exposure incidents and monitoring. |
| Engineer / Maintenance | 2 | [#4, #5, #9] Engineers for HVAC/dehumidification, generators and decontamination systems. |
| Administrative Staff | 2 | [#24, #25] Admin and liaison staff for legal/government relations and documentation. |
Confidence Notes
Estimates aggregate wide published ranges from analyst notes; baseline operational costs (staffing, research, maintenance) are relatively well-bounded, but outbreak frequency, scale, and potential policy actions are highly uncertain—hence medium confidence.