SCP-836 Keter ~ medium confidence
SCP-836
Expected annual
$15.0M
One-time setup
$12.4M
Annual recurring
$11.1M
Personnel
35
Initial capital outlay is roughly $12.44M for a single-site containment and lab setup; recurring baseline operations are ~ $11.07M/yr. Major cost drivers are staff wages, ongoing research/monitoring, outbreak response reserves, and large one-off policy/mitigation programs if enacted.
🏗️ One-Time Capital Costs Total: $12.4M
Facilities $6.0M
[#1] Purpose-built isolated containment vault, independent utilities and seismic isolation.
Initial Research And Lab Setup $4.1M
[#20, #21, #6, #28] Research program startup, laboratory instrumentation (SEM/µCT/etc.), sterilization kilns for lab use, and data/GIS setup.
Mobile Thermal Purchase $1.0M
[#7] Purchase of a mobile large-volume thermal treatment system / industrial pyrolyzer (option to purchase rather than rent).
Legal Program Initial $500K
[#25] Initial legal and governmental liaison program setup and outreach.
Casings Initial $250K
[#2] Two-layer CFRP casings with glass inserts initial procurement (20 casings).
Decon Infrastructure $200K
[#9] Airlocks, showers, waste holding, HEPA/acid scrubbers installed.
Dehumidifier Install $100K
[#4] Low-humidity environmental control installed (dessicant dehumidifiers, dry-gas purge).
Generator Install $100K
[#5] Redundant power, UPS and on-site generator/fuel-storage installation (capital).
Cctv Install $60K
[#11] CCTV, guarded perimeter hardware, tamper-proof recorders, hardened comms installation.
Sensor Array Install $50K
[#10] Continuous environmental monitoring and sensor array initial installation (RH, particulate, strain).
Ppe Stockpile $50K
[#23] Initial PPE and hazmat stockpile.
Chemical Neutralization Setup $30K
[#8] Warm nitric acid capability: heated baths, fume hoods, storage cabinets, neutralizers.
Equipment $0
[]
Sensor Deployment Initial City $0
[#18] Sensor deployment in at-risk buildings (city-scale deployment left as conditional/policy; costed in scenarios).
Policy Mitigation Initial $0
[#17] Long-term city/building mitigation program (policy design/implementation left conditional; major capital costs handled in scenarios).
Urban Replacement Program Initial $0
[#30] Large-scale urban replacement/renewal program (policy-scale; enacted only under a mitigation scenario).
🔄 Annual Recurring Costs Total: $11.1M/yr
Insurance And Compensation Reserve $5.0M/yr
[#26] Insurance, contingency and public compensation fund provisioning (size depends on operational area).
Staff Wages $2.5M/yr
[#12, #13] Scientists, technicians, security roster and support staff payroll.
Research And Monitoring $1.2M/yr
[#20, #21, #28] Ongoing research program funding, instrumentation service contracts, data analysis and GIS subscriptions.
Sensor Deployment Maintenance $500K/yr
[#18] Maintenance and node-service for deployed at-risk-building sensor network (if deployed at scale).
Outbreak Response Retainer $300K/yr
[#14] Retainers and standby contracts for demolition contractors, heavy equipment and rapid mobilization crews.
Cover Story And Legal $250K/yr
[#24, #25] Ongoing media/cover-story maintenance and legal/governmental liaison retainer costs.
Area Monitoring Reserve $250K/yr
[#16] Reserve budgeting for post-outbreak 14-month area monitoring (per-outbreak cost provisioning).
Logistics And Transport $200K/yr
[#19] Standing secure transport program, armored couriers and route security (annual program costs).
Evacuation Fund Annual Provision $200K/yr
[#15] Annual provisioning for evacuation/sheltering costs (per-event provisioning; major events cost more and are scenario-driven).
Training And Drills $150K/yr
[#27] Regular multi-agency exercises, PPE drills and demolition/HVAC interlock drills.
Facilities Maintenance $120K/yr
[#4, #5, #9, #10, #11] Energy and maintenance for dehumidification, generator fuel/maintenance, decon filter replacement, sensor upkeep, CCTV/system maintenance.
Hazardous Waste Contract $100K/yr
[#22] Hazardous waste handling and disposal contracts (annual).
Supplies And Consumables $70K/yr
[#8, #21, #23] Chemical neutralization consumables, laboratory consumables, PPE replenishment.
Replacement Cfrp Panels $60K/yr
[#3] Annual replacement stock and fabrication runs for CFRP panels and glass inserts (wear-and-tear).
Mobile Thermal Rental Reserve $50K/yr
[#7] Annual budget for rented mobile thermal treatment per-event access and logistics.
Containment Auditing $50K/yr
[#29] Containment documentation, auditing and compliance program (annual audits and reporting).
Sterilization Operational Reserve $20K/yr
[#6] Operational costs for sterilization runs (gas/electric/staffing for routine sterilizations).
Cost Scenarios
📊 Baseline (baseline) $11.1M/yr
80.0% probability / year
Normal year with routine operations, maintenance, research and readiness reserves; no outbreak or policy-scale mitigation enacted.
no_incident routine_operations
🚨 Minor Incident $12.6M/yr
15.0% probability / year +$1.5M vs baseline
Localized inner-casing breach or small outbreak requiring room-level thermal treatment, limited evacuation, targeted monitoring and cover-up.
inner_casing_breach localized_proliferation minor_evacuations
🚨 Major Breach $61.1M/yr
3.0% probability / year +$50.0M vs baseline
Widespread proliferation into utilities or multiple structures requiring large-scale evacuations, long-area monitoring, demolition and major remediation.
widespread_proliferation contact_with_water_networks major_structural_failures
🚨 Policy Mitigation Enacted $121.6M/yr
2.0% probability / year +$110.5M vs baseline
Government/authority adopts large-scale mitigation: city-building retrofits, sensor roll-out and replacement of aging structures.
policy_decision large_scale_mitigation building_code_changes
👥 Personnel 35 total
Role Count Notes
Research Scientist 3 [#12] Materials science/chemistry/microbiology scientists to run experiments and analysis.
Laboratory Technician 6 [#12] Full-time technicians for sampling, maintenance, sterilization and instrument prep.
Security Officer / MTF Agent 20 [#13] 24/7 security roster with hazmat/CBRNE training and rapid-response capability.
Site Director / Executive Staff 1 [#12, #13] Program/operations lead overseeing containment.
Medical Officer 1 [#12, #13] On-call medical support for exposure incidents and monitoring.
Engineer / Maintenance 2 [#4, #5, #9] Engineers for HVAC/dehumidification, generators and decontamination systems.
Administrative Staff 2 [#24, #25] Admin and liaison staff for legal/government relations and documentation.
📋 Confidence Notes
Estimates aggregate wide published ranges from analyst notes; baseline operational costs (staffing, research, maintenance) are relatively well-bounded, but outbreak frequency, scale, and potential policy actions are highly uncertain—hence medium confidence.
← SCP-835 ↑ All SCPs SCP-837 →