SCP-8361
Unknown
~
medium confidence
SCP-8361
Expected annual
$1.2M
One-time setup
$1.8M
Annual recurring
$1.2M
Personnel
9
One-time setup costs (~$1.75M) are dominated by potential long-term facility upgrade and containment-related buildouts; recurring annual costs (~$1.17M/yr) are driven by security staffing, research/monitoring, and medical standby/oversight.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with routine operations: security, scheduled research access, maintenance, and periodic conservator visits with no significant incidents.
routine_operations
scheduled_research
no_incidents
🚨
Minor Incident
$1.2M/yr
Minor public incident or attempted theft resulting in temporary lockdown, overtime, limited forensic work, and PR/legal response.
attempted_theft
public_incident
small_breach_response
🚨
Major Breach
$1.9M/yr
Significant breach, theft attempt or exposure event requiring extended emergency response, forensics, medical treatment, repatriation logistics and substantial legal action.
organized_theft
large_scale_breach
medical_emergency
🚨
Forced Repatriation Or Containment Upgrade
$2.4M/yr
Decision/event forces return to Mexico or removal to a fully secure Foundation facility, triggering major one-time repatriation and facility upgrade/retrofit costs.
reclassification
geopolitical_change
artifact_escalation
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | [#8] Foundation covert security detail and covert monitoring (salaries, travel, standby overtime). |
| Security Officer / Museum Guard | 3 | [#7] Museum security reimbursement/augmentation (discreet control, after-hours checks) — estimated 3 guards incl. benefits. |
| Medical Officer | 2 | [#13] On-site medical/observation capability and standby EMT/medical personnel during access; imaging access coordination. |
| Visitor Management / Floor Staff | 1 | [#11] Additional floor staff to enforce the exclusion zone and manage crowds during open hours. |
Confidence Notes
Core operational and one-time setup figures are reasonably well-specified by the analyst notes (security, transport, display). Confidence is reduced by wide uncertainty in research program scope/cost (item #22) and the conditional long-term facility upgrade (item #23), both of which could change costs by orders of magnitude.