SCP-8381
Keter
~
medium confidence
SCP-8381
Expected annual
$68.6M
One-time setup
$274.1M
Annual recurring
$46.3M
Personnel
118
One-time containment and contingency setup costs are dominated by facility upgrades and a large catastrophic response reserve; recurring costs are driven by staffing, research, and MTF readiness. Baseline annual operations require tens of millions per year, while episodic outbreak responses can add millions to hundreds of millions per event.
One-Time Capital Costs
Total: $274.1M
Annual Recurring Costs
Total: $46.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$46.3M/yr
Routine, uneventful year with standing operations, R&D, MTF readiness, and routine monitoring only.
no outbreaks
routine monitoring and research
🚨
Minor Incident
$48.3M/yr
Localized outbreak requiring a single MTF deployment, removal of a small SCP-8381-1 instance, targeted remediation, and limited medical treatments.
single 9–15 m fruiting body
localized urban or rural cluster
single MTF response
🚨
Major Outbreak
$76.3M/yr
Large-scale urban outbreak or very large single SCP-8381-1 instance requiring heavy-lift demolition, broad remediation, major MTF deployments, and substantial public deception/medical surge.
30–50 m fruiting body
urban mass infections
wide-area soil/structural remediation
🚨
Catastrophic Pandemic
$1.0B/yr
Multi-site, uncontrolled spread requiring national/international mass quarantines, mass incineration/remediation, and very large emergency mobilization.
multi-site simultaneous outbreaks
failure of early containment
widespread SCP-8381-1 proliferation
Personnel
118 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 10 | [#13] Senior researchers and PI-level staff for countermeasure development and genomics. |
| Research Technician / Lab Tech | 20 | [#13, #18] BSL-4 lab technicians, sample processing, sequencing and routine testing staff. |
| Security Officer (Site) | 20 | [#1, #5] On-site security and checkpoint personnel (non-MTF) to enforce containment perimeters. |
| Security Officer / MTF Agent | 50 | [#7] Two standing 25-person Mobile Task Forces (Chi-7, Beta-7) maintained for deployments. |
| Engineer / Maintenance | 6 | [#1, #20] HVAC, generator, and facility systems engineering staff for BSL-4 and power redundancy. |
| Medical Officer | 6 | [#6] Clinical staff for ICU/BLS-4 isolation care, Amphotericin B administration, and medical screening duties. |
| Administrative Staff | 6 | [#21, #22] Procurement, legal liaison, PR cover-story coordination, and administrative oversight. |
Confidence Notes
Analyst notes provide many line-item ranges and operational detail allowing a mid-confidence estimate; however large ranges, episodic high-cost events, and intentionally open-ended catastrophic reserve figures reduce precision.