SCP-8404
Unknown
~
medium confidence
SCP-8404
Expected annual
$53.5M
One-time setup
$681.5M
Annual recurring
$49.7M
Personnel
142
One-time capital of ~$681,500,000 dominated by site construction, SRAs, robotics and contingency reserve; recurring annual costs ~ $49,700,000 driven by staffing, utilities, maintenance and long-term research.
One-Time Capital Costs
Total: $681.5M
Annual Recurring Costs
Total: $49.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$49.7M/yr
Normal year with no major containment incidents; routine operations and scheduled maintenance only.
continuous operation of SIMULACRUM and SRAs
scheduled maintenance and research activities
🚨
Minor Incident
$59.7M/yr
Small localized breach or cluster of SCP-8404-1 requiring targeted remote neutralisation and cleanup.
localized transmutation outbreak
single breach of red zone requiring MTF deployment
🚨
Major Breach
$199.7M/yr
Significant containment breach requiring extended MTF operations, major equipment replacement and civil mitigation measures.
Sustained SRA failure or SIMULACRUM outage
large-scale production of SCP-8404-1 clusters
🚨
Catastrophic Breach
$449.7M/yr
Widespread failure leading to major outbreak or destruction of containment infrastructure requiring multi-hundred-million-dollar response.
catastrophic failure of multiple SRAs
simultaneous loss of automated neutralisation and power redundancy
Personnel
142 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 50 | Approx. 40–60 MTF‑Lambda‑22 operators on standby; mapped to #14 wages. |
| Security Guard | 30 | ≈30 on-site security guards for perimeter and initial response; mapped to #15 wages. |
| Medical Officer / Anesthesiologist | 12 | Site anesthesiologists and med techs to manage induced coma protocols; mapped to #16 wages. |
| Engineer / Maintenance | 30 | Containment engineers, SRA technicians and robotic operators; mapped to #17 wages. |
| Research Scientist | 20 | Biologists, pathologists and materials scientists for ongoing study and countermeasure research; mapped to #18 wages. |
Confidence Notes
Line-item cost estimates are detailed in analyst notes (high granularity for capital and recurring items) but uncertainty remains around breach frequency, per-event severity and technology lifecycle; probabilities and per-event deltas are analyst judgments.