SCP-8437
Euclid
~
medium confidence
SCP-8437
Expected annual
$3.0M
One-time setup
$4.5M
Annual recurring
$2.9M
Personnel
11
Initial one-time setup and stabilization (sensors, secure suite, logging, and limited SRA deployment) estimated at approximately $4.5M; annual recurring costs dominated by specialist staff wages, monitoring/research, and IT/watchdog operations, about $2.85M/yr.
One-Time Capital Costs
Total: $4.5M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal year with routine monitoring, maintenance and scheduled research; no major incidents.
standard_operations
routine_testing
no_major_tampering
🚨
Minor Incident
$3.0M/yr
Localized digital tampering or small containment incident requiring forensic response, overtime and limited replacement/repair.
cyber_tampering
small_containment_event
🚨
Major Breach
$3.9M/yr
Significant containment breach or repeated tampering requiring temporary SRA activation, surge staffing, extended forensics, and larger PR/legal response.
containment_breach
SRA_activation
large_scale_forensics
🚨
Catastrophic Escalation
$5.8M/yr
Severe escalation affecting multiple personnel/systems or public exposure requiring major infrastructure deployment, large emergency reserve drawdown, and site-wide emergency measures.
systemic_leak
wide_spread_exposure
full_scale_SRA_deployment
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Site Lead / PI | 1 | [#1] Senior researcher/engineer responsible for overall program. |
| Research Technician | 2 | [#1] Lab and experimental support staff. |
| Containment Engineer / Technician | 2 | [#1] Maintain containment hardware, locks and physical systems. |
| Security Officer / MTF Agent | 4 | [#1] Rotating security personnel for 24/7 coverage. |
| Systems / Administrative (IT) | 1 | [#1] IT specialist for immutable logging, access control and monitoring. |
| Medical Officer / Clinician / Psychologist | 1 | [#1] Clinical support and staff psychological care. |
Confidence Notes
Estimates use midpoints of wide ranges provided; many line items (SRA deployment, long-term R&D, escalation reserve) are highly variable and scenario-dependent, producing moderate uncertainty. Staff salary estimates and recurring monitoring costs are better grounded.