SCP-8466
Safe
~
medium confidence
SCP-8466
Expected annual
$16.5M
One-time setup
$152.2M
Annual recurring
$15.9M
Personnel
61
Estimated one-time startup/capital costs are approximately $152.2M driven primarily by vessel acquisition, ISR/aircraft purchases, island infrastructure and a large contingency relocation estimate; recurring annual operations are about $15.94M driven by crewing, vessel upkeep, ISR/air operations, island staffing and contingency reserves.
One-Time Capital Costs
Total: $152.2M
Annual Recurring Costs
Total: $15.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.9M/yr
Normal year with routine patrols, island staffing, ISR, research and ongoing cover operations.
routine_operations
no_major_incidents
🚨
Minor Incident
$16.2M/yr
Small interdiction or storm damage requiring emergency repairs, short‑term increased PR/legal costs and modest replacement/consumable spending.
interdiction_with_damage
small_storm_repair
civilian_encounter
🚨
Major Breach
$18.4M/yr
Loss/damage of a patrol asset or major island infrastructure damage requiring multi‑month repairs and significant legal/operational expenditures.
vessel_loss
major_infrastructure_damage
significant_legal_exposure
🚨
Relocation Attempt
$115.9M/yr
Decision/year in which full relocation/neutralization effort is initiated, triggering the large contingency one‑time spend and associated surge costs.
full_neutralization_decision
large_scale_transport_and_containment
Personnel
61 total
| Role | Count | Notes |
|---|---|---|
| Vessel Crew (commanders/engineers/deckhands/boarding teams) | 35 | [#2] Full crewing for OPVs and RHIBs (30–40 crew assumed; compensation ~ $70k loaded). |
| Island Operations Staff (security, technical, maintenance, logistics, command) | 16 | [#6, #7, #8] 24/7 rotations on Île d'Or (12–20 personnel assumed; higher loaded cost due to remote hazard pay). |
| Research Scientist / Lab Technician | 6 | [#13] Research team (4–8 researchers/techs assumed; loaded costs included in staff_wages). |
| Data Analyst / Watch Desk Staff | 4 | [#20] 24/7 watch desk and data analysts for ISR, AIS filtering and incident reporting. |
Confidence Notes
Estimates are medium confidence: analyst notes provide ranges and clear cost drivers, but many items (vessel acquisition choices, actual sugar output, weather damage frequency, and contingency relocation feasibility) introduce substantial uncertainty.