SCP-852
Safe
~
medium confidence
SCP-852
Expected annual
$3.0M
One-time setup
$11.4M
Annual recurring
$3.0M
Personnel
15
One-time capital expenditures dominated by facility retrofit and optional large-format CT acquisition (~$11.4M total one-time). Recurring annual costs driven by specialized staff, Task Force availability, and ongoing monitoring/maintenance (~$2.98M/yr baseline).
One-Time Capital Costs
Total: $11.4M
Annual Recurring Costs
Total: $3.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.0M/yr
Normal year with steady containment, routine research and maintenance, no major incidents or relocations.
routine_operations
scheduled_scans
regular_maintenance
🚨
Minor Incident
$3.1M/yr
Localized equipment failure, limited contamination event, or small containment incident requiring repairs, sensor replacements and PR response.
sensor_failure
small_contamination
limited_pr_leak
🚨
Major Relocation
$4.2M/yr
Full relocation or heavy-haul campaign that requires heavy-lift logistics, contractor support, extended TF deployment, and site repairs.
facility_failure
strategic_relocation
catastrophic_site_event
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (senior/Level-4) | 3 | Senior anomaly physicists/materials scientists providing oversight and test authorization; salary estimates included in staff_wages. |
| Engineer / Technician / Conservator | 6 | Engineers, machinists, conservators and lab technicians handling daily operations, tooling, and maintenance. |
| Security Officer / Guard | 6 | Armed site security personnel rotating to provide continuous coverage; headcount and compensation included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing reasonable estimates, but wide ranges for major optional purchases (large CT) and contingency items introduce moderate uncertainty.