SCP-8522
Keter
~
medium confidence
AO-8522
Expected annual
$1.2M
One-time setup
$2.9M
Annual recurring
$1.1M
Personnel
6
Estimated one-time startup costs are dominated by contingency reserves, potential vault relocation, and specialized laboratory/equipment purchases; recurring costs are driven primarily by specialist staff wages, security, legal/PR and opportunity-cost allocations. Conservative baseline annual operations are approximately $1.13M, with one-time startup/contingency spending ~ $2.89M.
One-Time Capital Costs
Total: $2.9M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal operational year with no significant containment events; routine research, security, monitoring and administrative costs only.
no incidents
routine research and monitoring
standard staffing levels
🚨
Minor Incident
$1.3M/yr
Localized leak or small-scale public exposure requiring targeted buybacks, PR/legal response and incident research.
small public leak
localized buyback operations
targeted legal/PR action
🚨
Major Breach
$3.1M/yr
Widespread proliferation or multi-site leakage requiring large-scale buyback/containment, emergency research, and extended legal operations.
widespread market/black-market distribution
multiple simultaneous exposures
extended emergency research
🚨
Political Exposure
$6.1M/yr
National-level discovery requiring macroeconomic intervention, policy response, and large-scale mitigation efforts.
public confirmation of anomalous large-scale distribution
media/political attention
need for national economic mitigation
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#3] Two dedicated, cleared security officers to staff the locker during normal site hours. |
| Research Scientist | 2 | [#7] Two chemists/physicists to run experiments and characterize mechanism. |
| Lab Technician | 2 | [#7] Two lab technicians to support experiments, sample preparation, and instrument operation. |
Confidence Notes
Analyst notes provide detailed line-item ranges and clear mappings, enabling mid-point budgeting; however many items are contingent (vault relocation, large contingency reserves, national mitigation) and incident probabilities/costs are highly uncertain due to anomalous behaviour, yielding medium confidence.