SCP-8573
Keter
~
medium confidence
SCP-682-ARC
Expected annual
$10.2M
One-time setup
$46.2M
Annual recurring
$9.7M
Personnel
15
Initial startup one-time costs are dominated by an optional Manhattan property purchase and a catastrophic contingency fund (~$46.25M one-time). Annual operations run roughly $9.75M/year, driven primarily by covert-ops retainers, insurance/reserve funds, PR/legal suppression, telemetry/storage, and field maintenance.
One-Time Capital Costs
Total: $46.2M
Annual Recurring Costs
Total: $9.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.7M/yr
Normal year with regular monitoring, maintenance, suppression, and no major incidents.
routine monitoring
no breaches
standard maintenance cycles
🚨
Minor Incident
$10.7M/yr
Localized incident or sighting requiring elevated covert response, limited evacuations, extra PR/legal work, and operational overtime.
single-floor SCP-682-B activity
localized Tian Shan attack requiring rapid-response
🚨
Major Breach
$18.7M/yr
Significant containment failure requiring large evacuations, sustained suppression operations, cross-jurisdictional legal action, and major public-relations expenditure.
multi-building evacuation
sustained media exposure
international diplomatic complications
🚨
Catastrophic Breach
$39.7M/yr
Worst-case scenario that triggers full-scale escalation funds for neutralization/relocation or regional sealing; large one-time expenditures required.
regional-scale evacuation
mandated kinetic neutralization or cross-border military logistics
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Local Operative / Witness-Handling Operative | 6 | [#6] Six bilingual operatives in Central Asia (~$30k/year each included in staff_wages). |
| Video/Audio Analyst | 6 | [#12] Six analysts for 24/7 monitoring of fourth-floor feeds (~$60k/year each included in staff_wages). |
| Researcher / IT Support | 3 | [#19] Two researchers + one IT support for minimal research/archival work and data readiness (salaries included in staff_wages). |
Confidence Notes
Analyst notes are detailed and enumerate most cost centers, but many line items are ranges and several assumptions (mid-range selections, asset-purchase choices, and low-frequency scenario probabilities) were required; therefore confidence is medium.