SCP-8589
Keter
~
medium confidence
SCP-8589
Expected annual
$4.4M
One-time setup
$7.0M
Annual recurring
$3.8M
Personnel
27
Initial one-time establishment and contingency reserves drive capital costs (~$7.0M). Annual operations are driven by dedicated staffing, recurring recovery logistics, research/monitoring, and cover-story/legal work (~$3.77M/yr).
One-Time Capital Costs
Total: $7.0M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal operational year with routine recoveries, research, staffing and cover-story operations; no major containment failure.
routine_recoveries
scheduled_research
no_major_breach
🚨
Minor Incident
$3.9M/yr
Localized civilian exposure or single-site containment incident requiring MTF recovery, amnestic use, repairs and targeted cover-ups.
single_site_discovery
small_scale_replacement
amnestic_administrations
🚨
Catastrophic Breach
$23.8M/yr
Widespread civilian/infrastructure penetration or containment breach requiring large-scale remediation, replacement and major public concealment efforts.
industry_level_penetration
critical_infrastructure_involvement
mass_replacements
Personnel
27 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#8] Standing MTF-Ptah rapid-response operatives assigned for recoveries and tactical operations. |
| Security Officer (site guards) | 8 | [#9] Incremental armed guards and site security to maintain 24/7 monitoring beyond baseline Site staffing. |
| Research Scientist | 6 | [#12, #13] Specialized memetic researchers, materials scientists and analysts for ongoing anomalous testing and countermeasure development. |
| Engineer / Maintenance | 2 | [#2, #20] Technicians for remote-handling systems, HVAC, UPS/generator and containment equipment maintenance. |
| Administrative Staff | 2 | [#16, #21] Evidence management, chain-of-custody administration and cover-story/legal coordination support. |
| Medical Officer | 1 | [#14, #15] Medical oversight for amnestic administration, post-exposure care and personnel screening. |
Confidence Notes
Estimates use midpoints of wide ranges provided; major uncertainties include contradictory volume figures (1.5 t vs 115.2 m^3), unknown frequency of civilian discoveries, and site-specific reuse of existing Foundation infrastructure which could reduce costs. Scenario probabilities are expert judgment given Keter status and documented breach history.