SCP-8600
Unknown
~
medium confidence
SCP-8600
Expected annual
$393K
One-time setup
$1.5M
Annual recurring
$357K
Personnel
3
Initial one-time setup and contingency provisioning are the largest upfront costs (~$1.55M), driven by containment/sample vaulting, worst-case recovery reserves, and specialized equipment. Annual operations are modest-to-moderate (~$357k/yr) dominated by personnel (retainer + handler + conservator), travel/logistics for monthly visits, and administrative/IT overhead.
One-Time Capital Costs
Total: $1.5M
Annual Recurring Costs
Total: $357K/yr
Cost Scenarios
📊
Baseline
(baseline)
$357K/yr
Normal uneventful year with monthly maintenance by Bumaro and routine monitoring; no major incidents or recoveries.
monthly_maintenance_completed
no_sample_anomalies
no personnel loss or political incidents
🚨
Minor Incident
$457K/yr
Localized anomalous property discovered in sampled material or unexpected changes in murals require targeted analysis, temporary enhanced monitoring, and limited containment measures.
anomalous_sample_detected
accelerated mural degradation
sensor_alerts requiring forensic analysis
🚨
Political Exposure
$557K/yr
SCP intermittently manifests in a sovereign territory or attention from local authorities requires sustained diplomatic/cover operations and possible buy-off costs.
incident_in_sovereign_territory
local_authorities_interest
diplomatic_leverage_needed
🚨
Major Recovery Operation
$1.4M/yr
Bumaro compromised or SCP becomes hazardous/accessible to unauthorized parties, triggering a large-scale recovery/recontainment campaign.
loss_of_primary_locator
significant_breach_or_hazard
large tactical recovery needed
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| Primary Access / Maintenance Agent (contracted) - Robert Bumaro | 1 | [#1] Single individual who knows coordinates and performs monthly maintenance; budgeted as a retainer/compensation (item #1). |
| Handler / Liaison Officer | 1 | [#3] One FTE handler to manage scheduling, security briefs, communications and paperwork (item #3). |
| Research Scientist / Conservator (part-time/contract) | 1 | [#12] Part-time conservator/consultant for mural/book preservation and treatment oversight (item #12). |
Confidence Notes
Line-item ranges are provided by analysts but many costs depend on uncertain factors (distance/location variability, whether fuladh proves anomalous, and reliance on a single human asset). Estimates use conservative midpoints; uncertainty about incident rates and contingency sizing keeps confidence at medium.