SCP-8625
Safe
~
medium confidence
SCP-8625
Expected annual
$1.3M
One-time setup
$1.4M
Annual recurring
$1.3M
Personnel
11
Estimated one-time capital costs are approximately $1.39M, driven by facility upgrades (BSL-3 retrofit possible), secure containment modifications, and an initial contingency reserve. Annual recurring costs are approximately $1.27M, driven primarily by staff wages (security and research), ongoing legal/cover expenses, lab operations and sample analysis.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal operating year with active containment and scheduled testing at modest scale; no major incidents or exposures.
routine monitoring
scheduled testing
no breaches or legal crises
🚨
Minor Incident
$1.3M/yr
Small accidental exposure or localized contamination requiring medical treatment, limited decontamination and incident review.
minor accidental exposure
localized decontamination
short-term sick leave
🚨
Major Breach
$2.8M/yr
Containment breach or significant bio/chemical contamination requiring extensive decontamination, emergency medical evacuations, replacement of lab infrastructure and major legal response.
major containment failure
widespread contamination
mass medical response
🚨
Political Exposure
$1.8M/yr
Media or local-authority exposure of testing/operations prompting heavy legal action, PR campaigns, and expanded cover operations.
information leak
local authority inquiry
public relations crisis
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] 24/7 guard coverage: 2per shift × 3 shifts = 6 FTEs. |
| Research Scientist | 1 | [#6] Principal investigator / project lead. |
| Lab Technician | 2 | [#6] Laboratory technicians supporting sample handling and assays. |
| Behavioral Analyst | 1 | [#6] Behavioral psychologist/analyst for subject-response studies and interpretation. |
| Data Analyst | 1 | [#6] Data analyst for logging, pattern analysis, and experiment results. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing mid-range point estimates, but several large items (BSL-3 retrofit need, testing rate, incident probabilities) are uncertain. Costs are therefore medium-confidence.