SCP-8667
Keter
?
low confidence
SCP-8667
Expected annual
$5.5M
One-time setup
$12.5M
Annual recurring
$5.2M
Personnel
21
Estimated one-time capital and remediation costs are approximately $12,480,000, with recurring annual costs of about $5,235,000; the main recurring drivers are continuous fuel consumption and staffing costs, while initial capital is dominated by power redundancy, facility recommissioning, and contingency reserves.
One-Time Capital Costs
Total: $12.5M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal operating year with scheduled maintenance, no major incidents.
regular_maintenance
scheduled_deliveries
no_breach_or_major_incident
🚨
Minor Incident
$5.7M/yr
Short-term containment incident or infrastructure failure requiring emergency repairs, overtime, and minor equipment replacement.
localized_hardware_failure
short_power_outage_exceeding_transfer_window
small_containment_event_requiring_drills_and_repairs
🚨
Major Breach
$12.7M/yr
Major containment failure or escalation requiring large emergency response, deployment of contingency capital, major repairs and PR/legal response.
prolonged_power_loss
catastrophic_equipment_failure
containment_breach_requiring_contingency_draw
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | Includes perimeter and rapid-reaction staffing; aggregated salary+benefits budget ~ $600k/yr (~$75k per person) [#8]. |
| Maintenance Technician | 5 | MT-8667B regular servicing and on-call technicians; aggregated wages ~ $450k/yr (~$90k per tech) [#9]. |
| Research Scientist / Lab Technician | 6 | Research and characterization staff for unknown anomaly; aggregated wages ~ $900k/yr (~$150k average) [#14]. |
| Emergency Response Team | 2 | Rapid-response crew members (on-call); wages portion included in staff_wages estimate ~ $200k/yr [#13]. |
Confidence Notes
Estimates are low-confidence due to unknowns in SCP power draw, hazard profile, and condition of the decommissioned Site-D4; many ranges were broad and contingent costs are highly scenario-dependent.