SCP-8667 Keter ? low confidence
SCP-8667
Expected annual
$5.5M
One-time setup
$12.5M
Annual recurring
$5.2M
Personnel
21
Estimated one-time capital and remediation costs are approximately $12,480,000, with recurring annual costs of about $5,235,000; the main recurring drivers are continuous fuel consumption and staffing costs, while initial capital is dominated by power redundancy, facility recommissioning, and contingency reserves.
🏗️ One-Time Capital Costs Total: $12.5M
Contingency Reserve $5.0M
[#15] Dedicated contingency / emergency capital reserve recommended minimum ~$5,000,000 (held available for rapid drawdown).
Equipment $1.9M
[#2, #3, #7, #10, #18] Six diesel generators + installation/pads/exhaust ~ $1,000,000; ATS/paralleling controls ~ $200,000; UPS/flywheel bridging hardware ~ $250,000; monitoring/SCADA/CCTV install ~ $250,000; initial info-security hardware ~ $150,000.
Facilities $1.6M
[#1, #11, #21] Recommissioning Isolation Unit 2 (seal/structural rehab) ~ $750k; perimeter hardening capital (fencing, barriers, anti-dig) ~ $500k; HVAC/environmental control installation ~ $325k.
Initial Research And Lab Setup $1.2M
[#14] Initial secure lab outfitting and characterization equipment for unknown-object research ~ $1,250,000.
Specialized Containment Gear $1.0M
[#27] Contingent budget for specialized demolition/disposal containers and protocols (contingent) ~$1,000,000.
Containment Restoration Protocols Development $750K
[#16] Development of containment-restoration protocols (simulations, consultants, field trials) ~$750k.
Spare Parts Inventory $300K
[#20] Initial critical spares inventory (generator components, ATS spares, door actuators, HVAC compressors) ~ $300k.
Emergency Response Equipment $300K
[#13] Initial emergency response vehicle(s), PPE caches, decon and medical gear ~ $300k.
Bulk Fuel Infrastructure $250K
[#4] Above-/below-ground tanks, containment berms, pumps, filters and installation ~ $250k.
Public Relations Initial $175K
[#25] Initial deniable subcontractor/cover integration and campaign one-off costs ~$175k.
Environmental Permitting Initial $50K
[#12] Initial permitting/engineering for fuel storage and hazardous materials ~$50k.
Data Archival Setup $30K
[#22] Initial secure archival/off-site backup setup and infrastructure ~$30k.
🔄 Annual Recurring Costs Total: $5.2M/yr
Staff Wages $2.1M/yr
[#8, #9, #14] Security staff, maintenance technicians (MT-8667B), and research staffing: security ~ $600k/yr (8 guards), maintenance techs ~ $450k/yr (5 techs incl. on-call premiums), research staff ~ $900k/yr (team of scientists/techs).
Fuel Consumption $1.0M/yr
[#5] Continuous running of at least four generators: budget estimate ~$1,000,000/yr (range $500k–$2M depending on load).
Facilities Maintenance $525K/yr
[#6, #11, #21] Generator light maintenance and scheduled overhauls averaged ~$400k/yr; perimeter maintenance ~$75k/yr; HVAC service and HEPA changes ~$50k/yr.
Emergency Response Recurring $300K/yr
[#13] Recurring costs for drills, PPE replacement, crew training and readiness (excludes initial vehicle/equipment) ~$300k/yr.
Capital Replacement Reserve $300K/yr
[#26] Depreciation/replacement reserve for multi-year capital replacement (5%–15% of capital) ~ $300k/yr.
Research And Monitoring $265K/yr
[#10, #14, #22] Ongoing monitoring/SCADA/data services and non-salary research expenses (data storage, sample handling, experiment consumables) ~$265k/yr.
Logistics And Transport $200K/yr
[#9, #19] Fuel delivery logistics/escorted shipments, maintenance team travel/per-diem and parts shipments ~$200k/yr.
Cover Story And Legal $150K/yr
[#17, #25] Legal, FOIA mitigation, local government liaison and ongoing cover-story maintenance ~$150k/yr.
Spare Parts Replenishment $85K/yr
[#20] Replenish and manage spare-parts inventory under SLAs ~$85k/yr.
Supplies And Consumables $70K/yr
[#6, #24] Consumables (oil/filters/belts/batteries for generators) and hazardous waste handling/disposal/waste management ~$70k/yr.
Environmental Compliance $60K/yr
[#12] Ongoing permits, inspections, emissions monitoring, waste-oil disposal compliance ~$60k/yr.
Property Taxes And Insurance $60K/yr
[#23] Property taxes, site insurance and minimal non-generator utilities ~$60k/yr.
Info Security Recurring $40K/yr
[#18] Ongoing secure communications, server maintenance, audits and pentesting ~$40k/yr.
Ups Battery Replacement $30K/yr
[#7] Battery/rotor replacements and consumables for UPS/flywheel bridging system ~$30k/yr.
Cost Scenarios
📊 Baseline (baseline) $5.2M/yr
85.0% probability / year
Normal operating year with scheduled maintenance, no major incidents.
regular_maintenance scheduled_deliveries no_breach_or_major_incident
🚨 Minor Incident $5.7M/yr
12.0% probability / year +$500K vs baseline
Short-term containment incident or infrastructure failure requiring emergency repairs, overtime, and minor equipment replacement.
localized_hardware_failure short_power_outage_exceeding_transfer_window small_containment_event_requiring_drills_and_repairs
🚨 Major Breach $12.7M/yr
3.0% probability / year +$7.5M vs baseline
Major containment failure or escalation requiring large emergency response, deployment of contingency capital, major repairs and PR/legal response.
prolonged_power_loss catastrophic_equipment_failure containment_breach_requiring_contingency_draw
👥 Personnel 21 total
Role Count Notes
Security Officer / MTF Agent 8 Includes perimeter and rapid-reaction staffing; aggregated salary+benefits budget ~ $600k/yr (~$75k per person) [#8].
Maintenance Technician 5 MT-8667B regular servicing and on-call technicians; aggregated wages ~ $450k/yr (~$90k per tech) [#9].
Research Scientist / Lab Technician 6 Research and characterization staff for unknown anomaly; aggregated wages ~ $900k/yr (~$150k average) [#14].
Emergency Response Team 2 Rapid-response crew members (on-call); wages portion included in staff_wages estimate ~ $200k/yr [#13].
📋 Confidence Notes
Estimates are low-confidence due to unknowns in SCP power draw, hazard profile, and condition of the decommissioned Site-D4; many ranges were broad and contingent costs are highly scenario-dependent.
← SCP-8666 ↑ All SCPs SCP-8668 →