SCP-8684
Safe
~
medium confidence
SCP-8684
Expected annual
$1.6M
One-time setup
$2.7M
Annual recurring
$1.6M
Personnel
16
First-year one-time costs are dominated by land purchase/site hardening, containment construction and a contingency reserve (~$2.72M total one-time). Ongoing annual costs are driven by staff wages, recurring research/outsourcing, surveillance and contractor budgets (~$1.556M/year).
One-Time Capital Costs
Total: $2.7M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with no containment incidents; recurring operations continue as planned.
routine operations
scheduled research
no containment incidents
🚨
Minor Incident
$1.7M/yr
Localized containment event or discovery that requires emergency response, extra testing and limited remediation.
localized leak/partial containment breach
unexpected fragment activity requiring extra testing
single disposal event
🚨
Major Breach
$3.1M/yr
Significant containment failure or public exposure requiring relocation, large-scale disposal, heavy legal/cover operations and major research escalation.
major containment failure
public exposure/media/legal escalation
need for full relocation or large-scale destruction
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Project Lead | 1 | [#19] Senior researcher/project manager overseeing program. |
| Research Scientist / Biologist / Pathologist | 3 | [#13, #14, #19] Scientists conducting autopsy, molecular and biochemical research. |
| Lab Technician | 2 | [#14, #19] Technicians supporting assays, sample prep and routine lab operations. |
| Security Officer / MTF Agent | 8 | [#5, #19] 24/7 site guards across shifts (6–8 recommended); count set at 8 for redundancy. |
| Medical Officer | 1 | [#19] On-call medic for staff and emergency response. |
| Forensic Archaeologist / Anthropologist | 1 | [#3, #19] Specialist for surveying, controlled excavation and fragment handling. |
| Administrative Staff | 0 | [#23] Administrative/IT functions assumed covered by contractors/overhead rather than dedicated full-time hires in this budget. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing mid-range budgeting, but choices (outsourcing vs in-house BSL upgrade, exact land price, research intensity, and incident frequency) introduce material uncertainty; estimates use midpoints and conservative contingency.