SCP-8733
Safe
~
medium confidence
SCP-8733
Expected annual
$1.9M
One-time setup
$365K
Annual recurring
$1.9M
Personnel
9
Up-front capital of roughly $365,000 for containment and monitoring equipment, with primary annual costs driven by staff wages, pathology/autopsy throughput, legal/cover operations, and a contingency reserve — total recurring ~ $1.88M/yr.
One-Time Capital Costs
Total: $365K
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with weekly vending events, primarily deceased subjects, contracted cremation and outsourced autopsies; routine operations and reserves maintained.
weekly deceased vendings
no major media exposure
standard staffing levels
🚨
Increased Live Events
$2.2M/yr
Year with a notable cluster of live vends (medical admissions increase) requiring more hospital transfers, overtime, and additional legal/liaison work.
multiple live vendings
increased hospital transfers
overtime for extraction/medical staff
🚨
Public Exposure
$3.0M/yr
Significant media/public exposure or legal subpoena demands leading to emergency cover operations, settlements, extended legal defense and large PR/containment spending.
media leak
subpoena or public investigation
whistleblower or visible incident
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Dedicated Extraction / Security Team | 4 | [#5] Four FTE rapid-response/extraction personnel assigned to removals and scene security (costed as $300,000/yr total). |
| Paramedic / Medical Officer | 1 | [#6] One FTE paramedic/trauma tech on call or allocated (~$80,000/yr). |
| Forensic / Research Staff | 1 | [#15] Pathologist/lab tech allocation (~1.0 FTE combined; costed in staff_wages). |
| Additional Security Officers | 3 | [#23] Incremental security staffing specifically attributable to SCP-8733 (2–4 FTE range; mid allocation used). |
Confidence Notes
Many recurring line items are well-scoped (weekly cadence, per-case pathology, staffing), but several large ranges (legal/cover, autopsy depth, disposal choices, contingency) introduce moderate uncertainty; assumptions favor contracted disposal and mid-range estimates.