SCP-8775
Safe
~
medium confidence
SCP-8775
Expected annual
$175K
One-time setup
$413K
Annual recurring
$134K
Personnel
1.65
Initial one-time setup costs are modest-to-moderate (~$413k) driven primarily by an optional expanded research program and neuroimaging equipment; recurring annual operations are low-to-moderate (~$134k/yr) driven by staff wages, data management, and legal/insurance/monitoring.
One-Time Capital Costs
Total: $413K
Annual Recurring Costs
Total: $134K/yr
Cost Scenarios
📊
Baseline
(baseline)
$134K/yr
Normal year with routine practice, recordings, archival, and maintenance — no incidents or major projects initiated.
routine_practice_and_recording
regular_maintenance
no_incident
🚨
Minor Incident
$152K/yr
Small security or memetic incident requiring limited response (consultants, targeted amnestic/repairs, minor replacement of hardware).
localized_memetic_effect
theft_attempt_or_hardware_damage
consultant_deployment
🚨
Major Breach
$209K/yr
Significant containment breach or memetic incident requiring large-scale emergency response, temporary relocation, and amnestic deployment.
containment_breach
widespread_memetic_exposure
major_emergency_response
🚨
Research Scale Up
$534K/yr
Foundation elects to initiate an expanded neuroimaging/long-term research program, incurring large one-time project start costs plus elevated first-year staffing/scan expenses.
approval_of_expanded_study
neuroimaging_project_start
multi-year_memory_mapping_project
Personnel
1.65 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Lee Roy Carlson) | 1 | [#1] Primary performer required to practice; salary portion (~$23k/yr charged to project). |
| Research Technician / Assistant | 0.5 | [#2] 0.5 FTE operator for recording equipment, logs, and chain-of-custody (~$25k/yr). |
| Project Manager / Administrative Staff | 0.15 | [#17] 0.1–0.2 FTE program management allocated to project (~$7.5k/yr). |
Confidence Notes
Analyst notes provide detailed line items and ranges; however several costs are provided as ranges and optional/contingent (neuroimaging, expanded program, contingency fund replenishment), so point estimates here use midpoints and judgement — resulting in medium confidence.