SCP-879
Euclid
~
medium confidence
SCP-879
Expected annual
$27.4M
One-time setup
$72.5M
Annual recurring
$25.2M
Personnel
30
First-year deployment requires approximately $72,500,000 in one-time costs (major driver: contingency/reserve and specialized tank/retrofits) and ongoing annual operations of roughly $25,197,500, driven primarily by three research ships, staff wages, R&D, and perimeter/cover costs.
One-Time Capital Costs
Total: $72.5M
Annual Recurring Costs
Total: $25.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$25.2M/yr
Normal year with routine operations and no major containment incidents.
routine_operations
scheduled_maintenance
ongoing_research
🚨
Minor Incident
$27.7M/yr
Localized containment incident or equipment failure requiring emergency response, limited repairs, and temporary ship/drone surge.
localized_breach
equipment_failure
limited_exposure
🚨
Major Breach
$75.2M/yr
Significant containment failure with public exposure, large-scale cleanup, replacement of major assets, and extensive legal/compensation costs.
catastrophic_breach
public_exposure
loss_of_ships_or_major_assets
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 6 | [#14] Chemists/neurobiology staff for pheromone research and monitoring |
| Marine Biologist | 6 | [#14] Marine specialists for animal care and behavior monitoring |
| Veterinarian / Anesthesiologist | 2 | [#14] Surgical and anesthetic specialists for sedation and emergency procedures |
| Engineer / Maintenance | 6 | [#14] Life-support, HVAC, pumps, sensor, and ship/vehicle maintenance |
| Security Officer / MTF Agent | 6 | [#14] Perimeter enforcement, ship security, and rapid-response teams |
| Medical Officer | 2 | [#14] On-call OR support, medevac coordination |
| Administrative Staff | 2 | [#14] Logistics, legal liaison, cover-story coordination |
Confidence Notes
Estimates use mid-range values from detailed analyst notes and capture primary drivers, but many assumptions remain (asset ownership vs charter, local rates, exact staffing mixes, and contingency sizing), so uncertainty is moderate.