SCP-881
Euclid
~
medium confidence
SCP-881
Expected annual
$1.6M
One-time setup
$1.9M
Annual recurring
$1.6M
Personnel
15
One-time capital/setup costs are approximately $1.85M driven by containment retrofits, research program startup, specialized equipment, and legal/contingency reserves; recurring annual operations run about $1.59M/yr driven primarily by staff wages, ongoing research, legal/OPSEC, and facilities maintenance.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal operational year with no major incidents; routine maintenance, research, and staffing costs only.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$1.7M/yr
Localized incident such as a small escape, filter breach, or contamination event requiring emergency response, targeted repairs, and limited PR/legal work.
filter_failure
single_instance_escape
localized_contamination
🚨
Major Breach
$2.3M/yr
Significant containment breach or contamination event requiring large-scale remediation, potential relocation, major repairs, and legal/ethical emergency expenses.
widespread_breach
facility_relocation
legal_exposure
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#8] Xenobiologist/ecologist and linguist/anthropologist — senior research staff (part of the 4 FTE research complement). |
| Research Technician | 2 | [#8] Two research technicians supporting experiments, imaging, and routine sample handling. |
| Containment Technician / Facilities Maintenance | 2 | [#9, #3] Two full-time technicians trained in micro-containment, weekly maintenance, filter cleaning and emergency response. |
| Security Officer / MTF Agent | 7 | [#10] 24/7 security coverage across shifts (estimated 6–8 guards total; 7 used for budgeting). |
| Xenoveterinary / Medical Officer | 0.5 | [#11] Part-time xenovet/biological health specialist (budgeted as 0.5 FTE). |
| Administrative Staff | 1.5 | [#25] Program manager (1.0 FTE) plus 0.5 FTE administrative support apportioned to this program. |
Confidence Notes
Analyst notes provide detailed line-item estimates for most categories, allowing a reasonable cost build-up; uncertainty remains due to anomalous behavior, potential legal/sentience escalations, and the wide contingency ranges called out in the source material.