SCP-8830
Unknown
~
medium confidence
SCP-8830
Expected annual
$42.4M
One-time setup
$435.2M
Annual recurring
$36.9M
Personnel
252
One-time capital and remediation costs are large (~$435M) driven by subterranean containment construction, hazardous soil excavation/disposal, and infrastructure rebuilds; ongoing annual costs are substantial (~$37M/yr) dominated by security, research, and long-term staffing.
One-Time Capital Costs
Total: $435.2M
Annual Recurring Costs
Total: $36.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$36.9M/yr
Normal, uneventful year with only scheduled operations, monitoring and staffing costs.
no major contamination events
routine remediation and monitoring
steady staffing and research activity
🚨
Minor Incident
$44.9M/yr
Localized reactivation or containment lapse requiring targeted remediation and emergency response.
localized SCP-8830-A flare-up
small containment breach
vehicle/unauthorized intrusion
🚨
Major Breach
$186.9M/yr
Large-scale breach or reactivation requiring broad excavation, mass disposal, accelerated subterranean construction and significant rebuilding.
widespread reactivation of SCP-8830-A
failure of perimeter and containment systems
large civilian casualties / infrastructure destruction
Personnel
252 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 120 | Perimeter guards, patrols, quick reaction force and checkpoints; accounts for majority of continuous security staffing [#3]. |
| Rapid Response / DECC Specialists | 40 | On-call containment specialists, hazardous-material teams and DECC operatives for immediate incidents and drills [#5]. |
| Containment Site Staff (technicians & maintenance) | 50 | Permanent subterranean site technicians, maintenance and on-site operational staff once underground facility is active [#28]. |
| Research Scientist | 20 | High-containment researchers and lab staff for SCP-8830 study and monitoring [#11]. |
| Administrative Staff | 10 | Site administration, logistics coordination, legal/PR liaison and records management [#18, #24]. |
| Medical Officer | 4 | On-site medical triage, long-term health surveillance and amnestic program oversight [#14, #25]. |
| Engineer / Maintenance | 8 | Power/utility, heavy equipment operators and communications/hardening maintenance [#20, #21, #26]. |
Confidence Notes
Estimates synthesized from analyst-provided ranges; many line items have wide ranges and depend on remediation choices (incineration vs excavation), engineering requirements for subterranean containment, and scale of reconstruction, so uncertainty is significant but bounded by provided ranges.