SCP-8903
Unknown
~
medium confidence
SCP-8903
Expected annual
$220K
One-time setup
$890K
Annual recurring
$198K
Personnel
0.8
Initial capital including containment construction, environmental control systems, and a conservative contingency reserve totals $890,500 one-time; annual operations (staff, utilities, maintenance, monitoring, and a reserve allocation) are approximately $197,500 before administrative overhead, with total recurring including overhead of $197,500 + $39,500 = $197,500? Correction: see totals below.
One-Time Capital Costs
Total: $890K
Annual Recurring Costs
Total: $198K/yr
Cost Scenarios
📊
Baseline
(baseline)
$198K/yr
Normal year with regular operations, no containment incidents beyond routine maintenance and scheduled training.
no_incident
routine_maintenance
🚨
Minor Incident
$222K/yr
Localized deviation (sensor failure, minor leak, short outage) requiring overtime, limited replacement parts, specialist callouts and short disruption to experiments.
localized_deviation
sensor_or_pump_failure
🚨
Major Breach
$1.2M/yr
Significant containment failure or large deviation (e.g., uncontrolled over-watering or humidity collapse) requiring site-level response, large-scale remediation, external contractors and use of contingency reserves.
uncontrolled_over-watering
large_area_expansion
Personnel
0.8 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 0.2 | [#11, #16] Part-time project lead/research oversight (Dr. Enkei oversight), fractional FTE reflected in wage allocation. |
| Botanical Technician | 0.2 | [#11] Part-time technician for daily checks, rain event confirmation and basic caretaking. |
| Security Officer / MTF Agent | 0.2 | [#10] Incremental security coverage (site-wide security provides primary coverage; small incremental cost included). |
| Engineer / Maintenance | 0.1 | [#2, #3, #7] On-call engineer/maintenance support for HVAC, pumps and generator service (fractional allocation). |
| Administrative Staff | 0.1 | [#18, #24] Fractional administrative support for permits, documentation and overhead coordination. |
Confidence Notes
Estimates are built from detailed analyst line items and site procedures, but the object's open-ended expansion risk and a wide range of vendor/scale costs introduce uncertainty; therefore medium confidence.