SCP-8911
Neutralized
~
medium confidence
SCP-8911
Expected annual
$3.7M
One-time setup
$63.1M
Annual recurring
$3.5M
Personnel
19
One-time capital/setup costs are dominated by a catastrophic decommissioning reserve and major structural restoration (~$63.09M total one-time), while recurring annual costs (~$3.47M/yr) are driven primarily by on-site and cover payroll, security, and specialized thaumaturgic/rapid-response retainers.
One-Time Capital Costs
Total: $63.1M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal year with no major incidents; routine maintenance, staffing, monitoring and cover operations only.
stable_neutralized_status
routine_maintenance
🚨
Minor Incident
$4.0M/yr
Localized reanimation or visitor incident requiring targeted emergency response, temporary closures, localized repairs and PR management.
localized_reanimation
visitor_injury
minor_structural_damage
🚨
Major Breach
$8.5M/yr
Significant partial reanimation or breach requiring MTF deployment, substantial repairs, prolonged closures and elevated inter‑GoI coordination.
partial_uncontrolled_animation
major_structural_damage
extended_MTF_operation
🚨
Catastrophic Decommissioning
$53.5M/yr
Uncontrollable reanimation or existential hazard forcing demolition or full neutralization with massive cleanup and political cover costs.
full_uncontrolled_animation
irreparable_hazard
political_exposure_requiring_demolition
Personnel
19 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#6] Covert on-site guards disguised as park/security staff; rotational staffing to provide 24/7 coverage. |
| Research Scientist | 2 | [#12] Researchers/technicians tasked with artifact analysis, monitoring and conservation (1–3 estimated; midpoint used). |
| Engineer / Maintenance | 3 | [#5] Maintenance technicians and maritime/boat crew for routine island upkeep and equipment maintenance. |
| Administrative Staff | 3 | [#5, #1] Front-company administrative, PR and bookkeeping staff required for visible cover operations. |
| Thaumaturgic Conservator / Specialist | 1 | [#4, #9] On‑retainer thaumaturgic conservator/contractor for ritual maintenance and specialist interventions. |
| Watch Officer | 1 | [#4] Watch officer / records custodian present in the on-site command node. |
| Site Liaison / Executive Staff | 1 | [#4, #14] Site liaison / front-company executive to manage NPS contracts and legal/compliance interactions. |
Confidence Notes
Analyst notes provide detailed line-item estimates for most categories, giving moderate confidence in budgeting for routine and incident costs; uncertainty remains around thaumaturgic maintenance needs and political/existential scenarios (catastrophic decommissioning), so tail risks are imprecise.