SCP-893
Safe
~
medium confidence
SCP-893
Expected annual
$3.7M
One-time setup
$1.8M
Annual recurring
$3.5M
Personnel
14
Initial capital costs are approximately $1.82M one-time to build BSL-3 nursery capability, incineration and support equipment; steady-state operations are ~ $3.49M/year driven primarily by personnel, contingency/reserve funds and recurring research/monitoring costs.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal year with no major incidents; routine monitoring, research, staffing, and replenishment.
routine_operations
occasional_single-instance_terminations
🚨
Minor Incident
$3.6M/yr
Localized escape or small-scale fragmentation event requiring extra overtime, emergency response and additional disposals/autopsies.
localized_escape
small-scale_fragmentation
temporary_staff_overtime
🚨
Major Outbreak
$21.0M/yr
Mass instance production / multi-appendage separations requiring rapid scale-up of beds, staff, disposal and decontamination (planned x5 scaling scenario).
mass_production_event
multiple_simultaneous_separations
facility_overcapacity
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Site Specialist Handler | 2 | [#7] Dedicated handlers to supervise SCP-893 and perform rapid extractions. |
| Security Officer / MTF Agent | 4 | [#7] Three-shift guard coverage plus backups; includes overtime and hazard premiums. |
| Research Scientist | 3 | [#9] Molecular biology/pathology researchers studying regenerative mechanism. |
| Lab Technician | 2 | [#9] Laboratory technicians supporting assays, sequencing, and sample handling. |
| Medical Officer | 1 | [#8] FTE physician for surgical/ER-capable procedures and oversight. |
| Nurse / Med Tech | 2 | [#8] Nursing/med tech coverage for procedures, sedation and on-call care. |
Confidence Notes
Analyst notes provide itemized estimates and realistic ranges for many line items, but several per-instance quantities (annual termination/autopsy counts, outbreak frequency) are assumptions; contingency/planning allocations add further variance.