SCP-8930
Euclid
~
medium confidence
SCP-8930
Expected annual
$1.7M
One-time setup
$2.9M
Annual recurring
$1.7M
Personnel
6
Initial one-time setup is estimated at about $2.93M, driven by SEP hardware, installation, property clearance/buyouts, and reserve funds; ongoing annual costs are roughly $1.67M dominated by staff wages, SEP upkeep, readiness/logistics, research, and cover/legal budgets.
One-Time Capital Costs
Total: $2.9M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal uneventful year with routine maintenance, staffing, drills, and research only.
no breaches
scheduled maintenance
routine drills
🚨
Minor Incident
$1.9M/yr
Small containment incident or SEP fault requiring emergency repairs, limited mobilization and PR/legal response.
localized SEP failure
minor leak or short-term public exposure
emergency repair callouts
🚨
Major Breach
$2.7M/yr
Significant containment breach or large-scale emergency requiring full mobilization, temporary relocation, large repairs/replacement of SEP hardware and major legal/PR action.
coordinated intrusion
SEP catastrophic failure
mass exposure or prolonged loss of containment
🚨
Political Exposure
$2.2M/yr
Unauthorized public or municipal discovery prompting political/legal scrutiny, large cover payments, and extensive municipal cooperation costs.
media leak
municipal investigation
public safety incident during drill
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Covert Liaison / Handler | 3 | [#7] Low-profile Foundation personnel acting as liaisons to Dr. Roue (medical/psychological/technical). |
| Engineer / Maintenance | 2 | [#5] Technicians/FTEs responsible for SEP maintenance, calibration, and emergency repairs. |
| Administrative Staff | 1 | [#17] Recordkeeping, oversight administration and coordination with municipal/legal teams. |
Confidence Notes
Analyst notes are detailed on categories and ranges, but large uncertainties remain due to local real-estate variability, availability/specification of SEP technology, and choices about buyout vs. lease strategies; contingency and reserve estimates attempt to capture those unknowns.