SCP-8944
Unknown
~
medium confidence
SCP-8944
Expected annual
$5.3M
One-time setup
$49.9M
Annual recurring
$5.2M
Personnel
21
Initial capital costs are dominated by Scranton Reality Anchors and exclusion-chamber engineering (~$50M one-time). Recurring annual operations are driven by site overhead, specialized SRA operations, security and research staffing, and emergency readiness (~$5.18M/yr).
One-Time Capital Costs
Total: $49.9M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal operational year with scheduled testing and standard maintenance; no unauthorized major incidents.
scheduled_testing
routine_maintenance
no_major_incidents
🚨
Minor Incident
$5.4M/yr
Limited unauthorized theft leakage or small civilian exposure requiring legal payouts, extra forensic searches, overtime and small repairs.
unauthorized_theft
civilian_exposure
limited_containment_issue
🚨
Major Breach
$10.2M/yr
Significant containment failure or testing leak requiring large-scale recovery operations, use of contingency reserves, major repairs and possible temporary relocation.
containment_failure
large_scale_recovery
forced_relocation
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#9, #10] 12 full-time guards (3 shifts) including specialized escorts; wage budget included in staff_wages. |
| Research Scientist | 4 | [#11, #27, #28] Lead researcher + 3 assistants for ongoing research and R&D follow-up; wages included in staff_wages. |
| Engineer / Maintenance (SRA technicians) | 3 | [#12, #4] 2–3 specialized technicians for SRA and exclusion-chamber maintenance; salaries included in staff_wages; spares listed separately. |
| Medical Officer | 1 | [#18] On-call medic / medical support staff; wages included in staff_wages; contingency listed separately. |
| Administrative Staff | 1 | [#22] Redaction/documentation labor and clerical support; wages included in staff_wages. |
Confidence Notes
Many line items are well-specified (staffing, recurring maintenance), but major cost drivers (SRA procurement, exclusion-chamber engineering, contingency reserves) have wide classified ranges; choices used midpoints and programmatic judgment.