SCP-8949
Euclid
~
medium confidence
SCP-8949
Expected annual
$30.4M
One-time setup
$32.6M
Annual recurring
$29.2M
Personnel
150
One-time capital/setup costs are estimated at $32,600,000 driven by facility construction, specialized instrumentation, reserves and decommissioning funds; recurring annual operations are estimated at $29,235,000/yr driven primarily by personnel payroll, legal/cover operations, research and logistics.
One-Time Capital Costs
Total: $32.6M
Annual Recurring Costs
Total: $29.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$29.2M/yr
Normal operational year with no major containment incidents; standard excavation, research, logistics and cover-up activities continue.
routine_excavation
normal_staff_rotations
standard_supply_chain
🚨
Minor Incident
$30.4M/yr
Localized increase in civilian exposure or a small-scale containment lapse requiring emergency response, additional amnestics and legal engagement.
localized_breach
increased_civilian_visibility
spike_in_amnestic_use
🚨
Major Breach
$39.2M/yr
Significant containment breach or sustained public exposure requiring large-scale remediation, litigation defense, and major operational surge.
sustained_public_exposure
large_scale_remediation
major_legal_actions
🚨
Political Exposure
$49.2M/yr
Discovery or credible political pressure results in aggressive investigations, buyouts, large compensations and expanded PR/legal costs.
government_inquiry
media_exposure
large_payouts_or_buyouts
🚨
Catastrophic Breach
$79.2M/yr
Full loss of containment, mass exposure or catastrophic legal/environmental outcome requiring major national-level response and full decommissioning.
full_containment_failure
mass_civilian_exposure
national_level_remediation
Personnel
150 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 30 | [#3, #12, #14] Geologists, archaeologists, memetics researchers and lab scientists included in site payroll and incremental research staffing. |
| Security Officer / MTF Agent | 35 | [#3, #23] Site security, patrols and memetic-safety trained officers; part of payroll and security operations. |
| Manual Laborer | 50 | [#3, #5, #6] Manual excavation workforce required due to interference zone; heavy reliance on manual digging and spoil handling. |
| Technician | 10 | [#3, #10, #11] Instrumentation technicians, lab techs, and maintenance staff for interference-hardened equipment. |
| Logistics / Drivers | 6 | [#7, #19, #29] Truck drivers, spoil distribution staff and logistics coordinators. |
| Engineer / Maintenance | 6 | [#2, #6, #27] Engineers for non-electrical spoil systems, generator/backup maintenance and R&D prototypes. |
| Administrative Staff | 8 | [#3, #16] Admin, HR, legal liaisons and cover-story administration. |
| Medical Officer | 4 | [#13, #20] On-site medics for amnestic administration, emergency response and casualty handling. |
| Site Director / Executive Staff | 1 | [#1, #3] Site director and executive oversight for Site-77 and auxiliary command center. |
Confidence Notes
Analyst notes provide explicit ranges for most line items allowing mid-point estimates, but uncertainty remains due to memetic effects, island logistics, and optional capital choices (e.g., aircraft purchase vs charter). Unpredictable breach/event probabilities further lower confidence.